My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200-27 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> ' 8.3. QUALITY <br /> Where detailed Specifications of materials, Equipment, or construction Work are not set forth, <br /> the Contractor shall perform the Work using materials and Equipment of a quality comparable to <br /> ' the materials and workmanship specified for the other parts of the Work, from firms of <br /> established good reputations, and shall follow standard practices to perform construction Work <br /> of good quality in a workmanlike way. Work performed shall be in conformity and harmony with <br /> ' the intent to secure the standard of construction and Equipment of Work as a whole and in part. <br /> All Work must comply and conform to applicable building codes in effect when the Work is <br /> performed. <br /> ' 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br /> When material or Equipment is specified by reference to patents, brand names, or catalog <br /> numbers, the Owner will not usually consider or approve a substitution. However, the <br /> ' Contractor may offer substitutions of products it considers to be equal to that specified, but the <br /> Owner is not obliged or required to consider or accept such offered substitution. <br /> 8.5. REQUESTS FOR SUBSTITUTION <br /> The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The <br /> Contractor's offers of substitution shall be made in writing to the Owner's Representative and <br /> ' shall include sufficient data to enable the Owner's Representative to assess the acceptability of <br /> the material or Equipment for the particular application and requirements. The Owner and <br /> Owner's Representative are not required or obligated to consider or review a request for <br /> ' substitution and may, in their sole discretion and option, consider or review such requests. <br /> If the offered substitution requires changes to or coordination with other portions of the work, the <br /> Contractor shall include with its substitution request any such drawings and details showing <br /> such changes. The Contractor agrees to perform these changes as part of the substitution of <br /> material or Equipment at no additional cost to the Owner. Approval of a substitution request <br /> shall not relieve the Contractor from responsibility for the efficiency, quality, and performance of <br /> ' the substitute material or Equipment, in the same manner and degree as the material and <br /> Equipment originally specified. Any cost differential associated with a substitution shall be <br /> reflected in the offer. If the Owner approves the substitution, the Contract Documents shall be <br /> modified by a Change Order modifying the Contract Sum in the amount of the cost differential. <br /> ' 8.6. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS <br /> 8.6.1. Inspection <br /> The burden of proving the constructed Work complies with the Contract Documents shall be on <br /> the Contractor at all times. To demonstrate its compliance with the Contract requirements, the <br /> Contractor shall assist the Owner's Representative in his or her inspection and observation of <br /> ' the Work. The Contractor shall grant the Owner's Representative access to the Work and Work <br /> Site, and to places where Work is being prepared, or where materials, Equipment, or machinery <br /> are being obtained for Work. The Contractor shall provide information requested by the <br /> ' Owner's Representative in connection with inspection work. <br /> If the Contract Documents, laws, ordinances, or any public regulatory authority requires parts of <br /> the Work to be specially inspected, tested, or approved, the Contractor shall give the Owner's <br /> ' Representative adequate prior written Notice of the availability of the subject Work for <br /> examination, which Notice shall be not less than two (2) working days. <br /> Inspection and quality control tests performed on Work by the Contractor by the Owner's <br /> ' Representative shall not relieve the Contractor of its responsibility for errors or lack of quality <br /> therein and shall not be regarded as an assumption of risks or liability by the Owner's <br /> 1 00 7200 -27 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.