Laserfiche WebLink
City of Everett 00 7200-28 <br /> ' Diversion Dam Road Phase 3 UT 3707& UT 3708 <br /> Representative for the Contractor's compliance with these Contract Documents. Contractor <br /> remains responsible and liable for all errors, defects or a lack of quality not discovered by <br /> inspection or observation. <br /> If parts of the Work are covered prior to inspection or observation, the cost of exposing the Work <br /> for inspection and closing and re-covering shall be borne by the Contractor regardless of <br /> whether the Work is found to be in compliance with the Contract. <br /> ' 8.6.2. Samples of Materials <br /> The Contractor shall provide Samples or specimens of materials to be incorporated in the Work <br /> that require laboratory examination or special testing, as requested by the Owner's <br /> Representative. Such Samples or specimens shall be provided in ample time to permit making <br /> proper test analysis and examinations before the Contractor plans to incorporate the material <br /> into the Work. An independent testing laboratory will conduct tests of material in accordance <br /> with the Specifications. In the absence of a specific test requirement, the Owner's <br /> ' Representative will determine the appropriate standard test to be used. <br /> 8.6.3. Certification <br /> ' In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests, the Contractor shall provide properly authenticated <br /> documents, certificates, or other proof satisfactory to the Owner's Representative that the <br /> materials and Equipment comply with the Contract requirements. These documents, <br /> ' certifications, and proofs shall include performance characteristics, construction materials, and <br /> physical or chemical characteristics of materials. The Contractor shall pay all associated costs <br /> of such certification. <br /> 1 <br /> 8.6.4. Inspection at Point of Manufacturing <br /> The Contractor shall be responsible and reimburse the Owner for the costs of inspections <br /> occurring outside of Whatcom, Skagit, Island, Snohomish, King, Pierce and Thurston counties if <br /> (a) inspection and testing of materials or Equipment in the vicinity of the Work by the Owner is <br /> not practicable, (b) the Contractor requests the Owner to inspect and test material or <br /> Equipment at the point of manufacture, or (c) the Specifications require that inspection, testing <br /> ' or witnessing of tests take place at the point of manufacture. Costs to be paid or reimbursed by <br /> the Contractor include, but are not limited to, travel, subsistence, labor and lodging expenses of <br /> the Owner's inspector. <br /> 1 <br /> 8.6.5. Testing and Commissioning of Completed Work <br /> Testing and commissioning of all mechanical, electrical, and instrumentation systems and <br /> completed portions of the Work, functioning as a completed system and the complete Project, <br /> ' functioning as a completed facility, shall be done in accordance with the Specifications. <br /> 8.6.6. Storage of Materials and Equipment <br /> Contractor shall store materials and Equipment so as to insure the preservation of their quality <br /> and fitness for the Work. Stored Equipment and materials shall be located so as to facilitate <br /> inspection. The Contractor shall be responsible for damages, loss or casualty occurring to <br /> ' materials and Equipment until Final Acceptance. <br /> 8.6.7. Manufacturer's Directions <br /> Manufactured articles, material and Equipment shall be transported, stored, applied, installed, <br /> ' connected, erected, adjusted, tested, operated and maintained as recommended by the <br /> manufacturer, unless otherwise specified herein. Manufacturer's installation instructions and <br /> procedures shall be provided to the Owner prior to installation of the manufactured articles, <br /> i <br /> material and Equipment. <br /> 00 7200-28 GENERAL CONDITIONS <br />