My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 2113 - 1 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> ' SECTION 00 2113 - INSTRUCTIONS TO BIDDERS <br /> PART 1 - GENERAL <br /> 1.1 GENERAL DESCRIPTION AND LOCATION OF PROJECT <br /> A. The Work to be performed will include furnishing all labor, materials and equipment <br /> necessary to perform all Work as required by the Contract in accordance with the <br /> ' Contract Documents. <br /> B. The Project Site is located on the Diversion Dam Road, Monroe, WA. <br /> 1.2 PROJECT MANAGER <br /> ' A. Questions and inquiries about the Contract Documents should be directed to the <br /> attention of Gael Fisk, City of Everett Project Manager at 425-257-8909 or email <br /> IGFisk@everettwa.gov. <br /> 1.3 STANDARD SPECIFICATIONS <br /> ' A. The following other Specifications and Standard Plans shall apply to the extent to which <br /> they are called out in the Contract Documents. <br /> 1. WSDOT "2018 Standard Specifications for Road, Bridge and Municipal <br /> ' Construction", as amended by the APWA Supplements, hereinafter referred to as <br /> the "Standard Specifications." <br /> 2. City of Everett "Design and Construction Standards and Specifications" (Revised <br /> ' 1-19), as found online on the City's Website at: https://everettwa.gov/319/Bid- <br /> Opportunities. <br /> 3. "Standard Plans for Road and Bridge Construction," latest edition as prepared by <br /> WSDOT. <br /> 1 4. "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br /> 5. APWA Standards, latest edition. <br /> 6. Washington Department of Natural Resources, "Forest Practice Board Manual". <br /> 1.4 EXAMINATION OF SITE CONDITIONS, CONTRACT DOCUMENTS AND <br /> ' REGULATIONS <br /> A. Bidders shall inspect the Site of the Work and carefully review the Contract Documents <br /> to satisfy themselves, by personal examination, or by such other means as they may <br /> ' prefer, of the location of the proposed Work, the actual physical conditions of and at the <br /> Site, surface and subsurface conditions, and conditions ordinarily to be encountered and <br /> generally recognized as inherent in the Work. If, during the course or as a result of such <br /> ' inspection, examination and testing, a Bidder finds facts or conditions that appear to <br /> conflict or are omitted from the Contract Documents, or with other data or material made <br /> 00 2113 - 1 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.