My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 6325 - 1 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> ' SECTION 00 6325 - SUBSTITUTION REQUEST FORM <br /> PROJECT: Diversion Dam Road Phase 3 REQUEST NO.: <br /> ' CONTRACTOR: DATE: <br /> We hereby submit for consideration, following product instead of specified item for <br /> ' above project: <br /> Section Specified Item <br /> Proposed Substitution <br /> ' Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> Attach detailed comparison of the significant qualities (size, weight, durability, <br /> ' performance and similar characteristics, and including visual effect where applicable) for <br /> the proposed substitution in comparison with the original requirements. <br /> ' List complete installation changes and changes to Drawings and Specifications required <br /> by proposal. <br /> ' Fill in Blanks Below: <br /> A. Does substitution require change in Drawing dimensions? <br /> ' B. Will Undersigned pay for resulting building design changes including engineering <br /> and detailing costs? <br /> C. What effect does substitution have on other trades? <br /> ' D. Differences between proposed substitution and specified item? <br /> ' E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different (Explain on attachment) <br /> ' F. Name and address of three (3) similar projects on which product was used, and <br /> date of installation <br /> G. Contract completion date is: Same Different (Explain on attachment). <br /> P ( p ) <br /> H. Cost Savings? <br /> 00 6325 - 1 SUBSTITUTION REQUEST FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.