My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 6325 - 2 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> Undersigned attests function and quality equivalent or superior to specified item and waives his <br /> ' rights to additional payment and time which may subsequently be necessitated, by failure of the <br /> substitution to perform adequately, and for the required work to make corrections thereof. <br /> ' Signature must be by a person having authority to legally bind his firm to the above terms. <br /> Failure to provide legally-binding signature will result in approval retraction. <br /> Submitted by: <br /> Signature Date <br /> ' Printed <br /> ' Firm <br /> Address <br /> Telephone <br /> For use by Architect/Engineer: <br /> Accepted Accepted as Noted Not Accepted Received Too <br /> ' Late <br /> BY: Date: <br /> ' Remarks: <br /> ' For use by Owner: <br /> Accepted Accepted as Noted Not Accepted Received Too Late <br /> ' Project Manager Date <br /> Remarks: <br /> END OF SECTION 00 6325 <br /> 00 6325 - 2 SUBSTITUTION REQUEST FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.