Laserfiche WebLink
' City of Everett 00 7200-2 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> Contract Time: The duration of the Project as stated in the Contract and as modified by any <br /> ' Change Orders. <br /> Contractor: The individual or entity with whom Owner has entered into the Agreement. <br /> ' Day: Calendar day, unless explicitly stated otherwise. <br /> Delay: Any increase of the duration of the critical path of the Project. <br /> ' Dispute: Any controversy or disagreement. <br /> Drawings: That part of the Contract Documents that graphically shows the scope, extent, and <br /> character of the Work to be performed by Contractor. Shop Drawings and other Contractor <br /> ' Submittals are not Drawings as so defined. <br /> Effective Date of Agreement: See 18.10 EFFECTIVE DATE. <br /> Engineer: An individual or entity retained by the Owner to be the Owners representative with <br /> ' regard to matters of design intent. The terms "Owner's Representative", "Engineer" and <br /> "Architect" are interchangeable. <br /> Equipment: Mechanical, electrical, instrumentation, or other devices with one or more moving <br /> ' parts, or devices requiring an electrical, pneumatic, electronic, or hydraulic connection. <br /> Extended Overhead: The increase in Overhead costs attributable to an extension of Contract <br /> Time. <br /> ' Extra Work: Providing materials and Equipment and the performance of Work not directly <br /> called for in, or implied by, the Contract Documents, such that Contractor would be entitled to an <br /> adjustment of Contract Sum and possibly an extension of Contract Time. <br /> ' Field Order: A written order issued by Owner's Representative that requires minor changes in <br /> the Work, but does not involve a change in the Contract Sum or the Contract Time. <br /> Final Acceptance: Formal action by Everett City Council determining that all of the <br /> Contractor's Work has been completed, except for any landscaping maintenance. <br /> Float: The amount of time between the early start date and the late start date, or the early finish <br /> date and the late finish date of any activity in the project schedule. <br /> 1 Force Account: Costs of performing Work as defined in 9.6. FORCE ACCOUNT. <br /> Furnish, Install, Perform, Provide, Supply: The word "Furnish" or the word "Install" or the <br /> ' word "Perform" or the word "Provide" or the word "Supply," or any combination or similar <br /> directive or usage thereof, shall mean furnishing and incorporating in the Work including all <br /> necessary labor, materials, equipment, and everything necessary to perform the Work indicated, <br /> ' unless specifically limited in the context used. <br /> General Conditions: This Section 007200 of the Contract Documents. <br /> May: Conduct that is permitted, but not required. <br /> ' Milestone: A principal event specified in the Contract documents relating to an intermediate <br /> completion date or time prior to Substantial Completion of all the Work. <br /> ' Notice: A signed, written communication by the Contractor to the Owner as described in <br /> ARTICLE 10. NOTICE TO OWNER. <br /> Notice to Proceed: The written Notice from the Owner or Owner's Representative to the <br /> ' Contractor authorizing and directing the Contractor to proceed with the Work and establishing <br /> the date on which the Contract Time begins. Multiple and partial Notices to Proceed may be <br /> issued on a single Project. <br /> ' Over-absorbed Overhead: Over recovery of fixed indirect costs that occurs when a Contractor <br /> performs more overall Work than it otherwise would have performed. <br /> 00 7200 -2 GENERAL CONDITIONS <br />