June 23, 2017 G-4400 <br /> Underpinning Evaluation Page 5 <br /> 2514- 515`Street SW,Everett <br /> TEMPORARY EXCAVATION <br /> Approximately 1 foot of excavation is needed below the bottom of the foundation wall/footing to install <br /> the pier bracket. The bottom of the foundation footing is estimated at about 1 foot below the existing <br /> floor slab of the basement,so a 2 foot deep excavation is anticipated if the piers are installed from the <br /> interior side of the basement. We understand the piers will be installed from the exterior side of the <br /> structure and an excavation depth of about 4 feet is anticipated. The sidewalls of the excavations <br /> should be sloped back at 1 H:1 V (Horizontal:Vertical) if the excavations are over 4 feet in depth,or <br /> temporary shoring should be installed.. <br /> LIMITATIONS <br /> This report has been prepared for specific application to this project Our recommendations are based <br /> upon the site conditions observed,the subsurface exploration conducted,engineering analysis, and our <br /> experience and engineering judgement. Our conclusions and recommendations are professional <br /> opinions derived in a manner consistent with the level of care and skill ordinarily exercised by other <br /> members of the profession currently practicing under similar conditions in this area and within the <br /> budget constraint. No warranty is expressed or implied. In the event that conditions vary from those <br /> described herein,or construction plans change, GEO Group Northwest, Inc., should be notified and <br /> the recommendations herein re-evaluated. <br /> GEO Group Northwest,Inc. <br />