My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc 9/6/2019 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2021
>
Jacobs Engineering Group Inc 9/6/2019 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:50:14 AM
Creation date
9/10/2019 10:50:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc
Approval Date
9/6/2019
Council Approval Date
8/28/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Alternatives Evaluation and Preliminary Desig
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
UP3714
Total Compensation
$205,418.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to show subsurface utility locations. Survey assumptions are as follows: <br /> • Maintenance holes over 25 feet deep or full of debris/water may not be surveyed since they <br /> may require confined space entry to access the maintenance hole in order to accurately <br /> measure the depth (if needed). <br /> • Trees of significance will be surveyed.Trees will be labeled with trunk and dripline diameter and <br /> will only be classified as coniferous or deciduous as far as the tree species unless directed <br /> otherwise. <br /> • Survey will call free one-call service and pick-up utilities that are marked. Survey will coordinate <br /> with a private utility locator to verify accuracy and completeness of information obtained from <br /> free one-call service within the survey limits. <br /> • Mapping will conform to City CAD standards (to be delivered to survey firm at a minimum of one <br /> week prior to field survey) and if no standards are provided Survey will use APWA CAD <br /> standards. <br /> • City to deliver all GIS utility data in typical GIS format at a minimum of 1 week prior to field <br /> survey. <br /> • Survey Basemaps will be provided in: U.S. Survey Feet NAD 83 (2011) horizontal and NAVD 88 <br /> vertical datum's unless otherwise directed. <br /> • Construction control is to be set outside of construction zone but within project area so that it <br /> can be used for construction. <br /> • The site survey will comply with the ASCE/CI/UESI Standard Guideline for the Collection and <br /> Depiction of Existing Subsurface Utilities Data and will be tied to the project survey datum.The <br /> survey will implement Quality Level C(QLC)which involves surveying visible utility facilities (e.g., <br /> maintenance holes,valve boxes, utility locates, etc.) and correlating this information with <br /> existing utility records. In addition, Utility Quality Level A(QLA) assigning an (x,y,and z <br /> geometry)where utilities are directly exposed will be implemented for up to 20 locations. <br /> • Survey assumes 4 potholing or pipe probes may be used to trace underground utilities, if <br /> needed to resolve crossing conflicts, etc. <br /> • Survey assumes that the SR08 will be scanned and City to assist opening both vault lids. <br /> • Field survey will be conducted along the alignment of the existing SR08 outfall pipe and outfall <br /> in the river,where future excavations may be required,to include location of existing utilities <br /> and other surface features. Investigation of the existing SR08 outfall terminus and river site will <br /> require access by boat provided by the Service Provider and using appropriate safety <br /> procedures. <br /> • Field survey at outfall location will include obtaining elevations along any exposed pipe, <br /> locations and elevations of other structural features, obtain elevations of top of bank, bottom of <br /> bank, and 3-5 cross-sections of the river at the outfall alignment.The survey will be sufficient to <br /> produce a detailed cross section at the pipeline outfall location. <br /> Deliverables: <br /> • Existing conditions topographic Base Map (PDF)with Subcontractor's professional land surveyor stamp <br /> and signature (no Hard Copies) <br /> • Existing Conditions 2D survey electronic file in AutoCAD 2016 or 2018-2020 Format <br /> • Existing 3D Surface DTM in electronic file in AutoCAD 2016 or 2018-2020 Format <br /> • Horizontal and Vertical Survey Control Drawings (Electronic PDF's only, no hard copies) <br /> 51P <br />
The URL can be used to link to this page
Your browser does not support the video tag.