Laserfiche WebLink
Preliminary Facility Plan Outline for Project including related Tasks and Deliverables, and Meetings Lists <br /> Facility Plan Section Phase 1 Related Interim Work Products <br /> Executive Summary Task 108 None <br /> Chapter 1. Introduction Task 108 None <br /> • Facility Plan Objectives <br /> • WFP Description <br /> • WFP Components <br /> Chapter 2. Existing Plant Assessment <br /> • Physical Condition Assessment of Major Unit Task 101 101. Condition and Criticality <br /> Processes and Support Buildings Assessment Plan TM (Draft/Final) <br /> o Process Mechanical Systems (e.g., Notes: 101. Condition and Criticality <br /> pumps, valves,flocculator drives/ Assessment Results TM (Draft/Final) <br /> paddles/ bearings) Facility/System level <br /> assessments <br /> o Site Piping <br /> Inside the fence, <br /> o Chemical Feed Systems (e.g., alum, except Portal 4 <br /> lime, soda ash, polymer, chlorine) <br /> o Structural Systems (e.g., buildings, <br /> tanks, equipment supports, clearwell <br /> baffles) <br /> o Electrical Systems <br /> o Instrumentation and Control Systems <br /> o Heating and Ventilation Systems <br /> o Water Sampling Systems <br /> o Pipeline Portal 4 <br /> 0 <br /> Page 27 <br /> (Form Approved by City Attorney's Office November 1, 2009) <br />