Laserfiche WebLink
Facility Plan Section Phase 1 Related Interim Work Products <br /> • Water Quality Performance Assessment Task 104 104. Regulatory and Water Quality <br /> Assessment TM (Draft/Final) <br /> • Hydraulic Performance Assessment Task 106 106. Hydraulic Profile Assessment <br /> TM (Draft/Final) <br /> • Major Unit Treatment Process Performance Task 103, 105 103. Solids Dewatering Technology <br /> Assessment Assessment TM (Draft/Final) <br /> o Mixing 105. Unit Process Performance TM <br /> o Flocculation (Draft/Final) <br /> o Filtration <br /> o Clearwell Storage <br /> o Filter Backwashing <br /> o Wash Water Storage <br /> o Recovered Water Handling <br /> o Backwash Solids Handling and <br /> Disposal <br /> • Plant Resiliency, Reliability, and Redundancy Task 102 102. 3R Assessment TM <br /> Assessment (Draft/Final) <br /> o Climate change <br /> o Natural disasters <br /> o Watershed <br /> o Infrastructure reliability and <br /> redundancy <br /> Page 28 <br /> (Form Approved by City Attorney's Office November 1, 2009) <br />