Laserfiche WebLink
manufacturer's specifications and good industry standards. Windows were <br /> caulked on all sides of the nailing fins and nailed per Alsid.e specifications. <br /> The areas inspected were observed to be completed with no outstanding <br /> correction items. <br /> Flashing: (Fortifiber High Performance System) <br /> Window flashing was inspected for correct application of material per <br /> product manufacturer's recommendations, builder's plans and specifications, <br /> building code and good industry standards. Flashing was installed before <br /> window installation using the Fortifiber High Performance system with sill <br /> corners. Fortiflash flashing was installed over the window jambs and head. <br /> The areas inspected were observed to be completed with no outstanding <br /> correction items, <br /> Sliding Doors: (Alside) <br /> Sliding Door installation was inspected for installation per product <br /> manufacturer's specifications and good industry standards. <br /> The areas inspected were observed to be completed with no outstanding <br /> correction items. <br /> Flashing: (Fortifiber) <br /> Sliding door flashing was inspected for correct application of material per <br /> product manufacturer's recommendations, builder's plans and specifications, <br /> building code and good industry standards. Flashing was installed before <br /> sliding door installation using Fortifiber Moistop flashing at the jambs. Self <br /> adhesive flashing was installed at the door thresholds before the doors were <br /> set. Fortiflash flashing was installed over the door jambs and head. <br /> The areas inspected were observed to be completed with no outstanding <br /> correction items. <br /> Weather barrier: (Tvpar) <br /> The weather barrier material was inspected for installation to manufacturer's <br /> recommendations and building code. <br /> The weather barrier was inspected to assure no tears, gaps or missing areas. <br /> Inspections were performed for correct overlap of material and taping of the <br /> seams, Inspections were performed for sealing of all penetrations in the <br /> weather barrier. A rainscreen system was installed at all areas over the <br /> weather barrier. Fir strips were installed under the trim and siding. <br />