My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10502 15TH DR SE BLDG J 2019-09-12
>
Address Records
>
15TH DR SE
>
10502
>
BLDG J
>
10502 15TH DR SE BLDG J 2019-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:49:13 AM
Creation date
9/12/2019 10:49:09 AM
Metadata
Fields
Template:
Address Document
Street Name
15TH DR SE
Street Number
10502
Tenant Name
BLDG J
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"NOP*.".' <br /> PUBLIC WORKS <br /> October 13, 2014 <br /> Project: Northlake Court Townhomes, Building J <br /> Job Address: 15th DR SE <br /> Plan Review No: C10522-023 through 028 <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that a permit cannot be issued until the following issues are resolved. These <br /> comments address building issues only. Additional revisions or additions may be required by <br /> other departments (such as Utilities, Planning or Fire). All references refer to the 2012 <br /> International Residential Code(IRC), as amended by the State of Washington and/or the <br /> Washington State Energy Code, 2012 edition, unless noted otherwise. <br /> In order for the processing of your application to continue, it will be necessary to provide <br /> the Building Division with two sets of drawings reflecting the corrections requested. <br /> 1. Detail 3a/A4.2 shows fire-rating treatment at the floor to wall intersection. The detail appears to <br /> be for a one-hour wall however and the project requires a two-hour wall assembly. Section <br /> R302.2 <br /> 2. The two-hour walls should be shown to continue to the underside of the over-framed dormer <br /> sheathing between units 2 &3 and 4&5 Section R302.2 <br /> 3. The roof of the upper unit at the building offset(two-hour wall) is shown to be less than 30"above <br /> the lower roof. The wall continuing above the lower unit to the underside of the roof of the upper <br /> unit should be shown to be of not less than one-hour construction (5/8"gyp sheathing should be <br /> shown on exterior side of the attic wall at the step roof condition). Section R302.2.2 <br /> 4. Wall section 3/A4.2 should be clarified to show that fire-retardant sheathing is also required for <br /> eave overhangs and over-framing within 4' of the two-hour wall. Section R302.2.2 <br /> 5. The two, one-hour walls separating the dwelling units requires mineral fiber per GA No. 3644. <br /> Wall section 3/A4.2 should be revised to show this requirement or a different fire-resistive wall <br /> assembly should be provided. Section R303.2 <br /> 6. An additional 20-minute door(or approved alternate)should be added to create a hallway <br /> between the 'storage' rooms and garages on the lower floors. The doors into the storage rooms <br /> could then be reduced to a non-rated passage doorway and note stating 'rooms not to be used as <br /> sleeping rooms' should be removed from the plans. Section R302.5.1 <br /> a. The CO alarms should be shown in the (new) hallway outside of the sleeping rooms on <br /> the first floor. Section R315.1 <br /> b. An additional smoke alarm should be shown in the (new) hallway outside of the sleeping <br /> rooms on the first floor. Section R314.3 <br /> 7. The 2'6"x2'6"slider in the bathroom of units#1&6 should be shownas safety glazing. Section <br /> R308.4.5 <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425)257-8800 • Fax(425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.