My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2017 BLDG 40-37 Plans 2022-12-05
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-37
>
Plans
>
3003 W CASINO RD 2017 BLDG 40-37 Plans 2022-12-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2022 1:23:37 PM
Creation date
9/17/2019 2:55:26 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-37
Permit
B1709-032
Year
2017
Notes
INSTALL 8 ACCESS PLATFORMS FOR FILTER MAINTENANCE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . ..._____-. . . .. . . _. .�__-.. . ._--.-_ . I <br /> ..Z <br /> SSUE LEGEND :� <br /> NOT YET ISSUED <br /> _ INCLUDED INCLUDED INCLUDED <br /> IN SET IN SET IN SET O PREVIOUSLY ISSUED, <br /> DRAWING N0. SHEET N0. DRAWING TITLE REV DATE DRAWING N0. SHEET N0. DRAWING TITLE REV DATE DRAWING N0. SHEET N0. DRAWING TITLE REV DATE NOT IN THIS ISSUE <br /> GE �IERA� E �ECTR CA� COf�TRO �S ) ��� �: <br /> • IN THIS ISSUE <br /> • 40-037—GO GO TITLE SHEET B 07.19.17 • 40-037—OE11 R OE11 R PARTIAL BASEMENT LIGHTING PLAN — REMOVAL A 07.19.17 • 40-037—e807 e807 LOCATION 1 B1301 PXC01A — 07.19.17 <br /> • 40-037—G1 G1 ABBREVIATIONS & SYMBOLS LEGEND A 07.19.17 • 40-037—OE12R OE12R PARTIAL BASEMENT LIGHTING PLAN — REMOVAL A 07.19.17 � 40-037—e807b e807b LOCATION 1VA1305 PXC01B — 07.19.17 �� <br /> • 40-037—G2 G2 DRAWING INDEX A 07.19.17 • 40-037—OE14R OE14R PARTIAL BASEMENT LIGHTING PLAN — REMOVAL A 07.19.17 • 40-037—e808 e808 LOCATION 1 C1302 PXCO2A — 07.19.17 — ORIGINAL ISSUE <br /> � 40-037—OE15R OE15R PARTIAL BASEMENT LIGHTING PLAN — REMOVAL A 07.19.17 • 40-037—e813 e813 LOCATION 1VC1307 PXC07A — 07.19.17 FOR PERMIT, BID, <br /> PROCUREMENT OR <br /> � 40-037—OE1 11 R OE1 1 1 R PARTIAL BASEMENT 277/480V POWER PLAN — REMOVAL B 07.19.17 • 40-037—e814 e814 LOCATION 1VC1307 PXC08 — 07.19.17 CONSTRUCTION <br /> ARCH TECTU RA� • 40-037—OE114R OE114R PARTI480BAP WER PLAN 48oREM0 ALR PLAN — REMOVAL B 07.19.17 � 40=037=e822 e822 LOCATION 1C1302 PXC22 = 07.19.17 <br /> • / 07.19.17 • 40 037 e827 e827 LOCATION 1 VB 1309 PXC27 07.19.17 - <br /> • 40-037—OA11 OA11 BASEMENT PLAN — AREA 11 E 07.19.17 � 40-037—OE115R OE115R PARTIAL BASEMENT LIGHTING PLAN — REMOVAL A 07.19.17 • 40-037—e827a e827a LOCATION 1VA1305 PXC27A — 07.19.17 A DRAWING REVISION — ' _ <br /> • 40-037—OAl2 OAl2 BASEMENT PLAN — AREA 12 E 07.19.17 � 40-037—OE561 R OE561 R PARTIAL BASEMENT 120V CONTROL PLAN — REMOVAL A 07.19.17 SEE SPECIFIC DRAWING � <br /> • 40-037—OA14 OA14 BASEMENT PLAN — AREA 14 E 07.19.17 � 40-037—OE562R OE562R PARTIAL BASEMENT 277/480V POWER PLAN — REMOVAL B 07.19.17 FOR NATURE OF <br /> REVISION <br /> • 40-037—OA15 OA15 BASEMENT PLAN — AREA 15 E 07.19.17 � 40-037—OE564R OE564R PARTIAL BASEMENT 120V CONTROL PLAN — REMOVAL A 07.19.17 �� <br /> • 40-037—A595 A595 MISCELLANEOUS DETAILS — 07.19.17 • 40-037—OE565R OE565R PARTIAL BASEMENT 120V CONTROL PLAN — REMOVAL A 07.19.17 <br /> � 40-037—E582-2R E582-2R LEAK DETECTION SYSTEM RISER DIAGRAM — REMOVAL C 07.19.17 <br /> � 40-037—E584R E584R LEAK DETECTION SYSTEM AND TANK DETAILS — REMOVAL C 07.19.17 <br /> STR U CTU RA� • 40-037—E584-1 R E584-1 R LEAK DETECTION AND SUMP DETAILS — REMOVAL — 07.19.17 <br /> � 40-037—E765R E765R F-fB-2B1401 — REMOVAL A 07.19.17 <br /> • 40-037—OS11 OS11 BASEMENT MAT FOUNDATION PLAN A 07.19.17 • 40-037—E766R E766R FTB-2C1402 — REMOVAL A 07.19.17 � �`��� <br /> �:� , <br /> • 40-037—OS12 OS12 BASEMENT MAT FOUNDATION PLAN B 07.19.17 • 40-037—OE11 OE11 PARTIAL BASEMENT LIGHTING PLAN A 07.19.17 ' <br /> • 40-037—OS14 OS14 BASEMENT MAT FOUNDATION PLAN A 07.19.17 • 40-037—OE12 OE12 PARTIAL BASEMENT LIGHTING PLAN A 07.19.17 <br /> • 40-037—OS15 OS15 BASEMENT MAT FOUNDATION PLAN A 07.19.17 • 40-037—OE14 OE14 PARTIAL BASEMENT LIGHTING PLAN A 07.19.17 � <br /> • 40-037—S454-1 S454-1 PARTIAL SUMP PUMP PLATFORM FRAMING PLANS — AREA 11 AND 12 — 07.19,17 • 40-037—OE15 OE15 PARTIAL BASEMENT LIGHTING PLAN A 07.19.17 <br /> • 40-037—S454-2 S454-2 PARTIAL SUMP PUMP PLATFORM FRAMING PLANS — AREA 12 AND 14 — 07.19.17 • 40-037—OE111 OE111 PARTIAL BASEMENT 277/480V POWER PLAN B 07.19.17 <br /> • 40-037—S454-3 S454-3 PARTIAL SUMP PUMP PLATFORM FRAMING PLANS — AREA 14 AND 15 — 07.19.17 • 40-037—OE112 OE112 PARTIAL BASEMENT 277/480V POWER PLAN D 07.19.17 <br /> O 40-037—OS501 OS501 BASEMENT WALL SECTIONS AND DETAILS A 07.19.17 • 40-037—OE114 OE114 PARTIAL BASEMENT 277/480V POWER PLAN B 07.19.17 <br /> • 40-037—OS510 OS510 SUMP PUMP PLATFORM DETAILS — 07.19.17 • 40-037—OE115 OE115 PARTIAL BASEMENT 277/480V POWER PLAN A 07.19.17 _ <br /> � 40-037—OE561 OE561 PARTIAL BASEMENT 120V CONTROL PLAN A 07.19.17 '��"�� <br /> >�, , <br /> • 40-037—OE562 OE562 PARTIAL BASEMENT 120V CONTROL PLAN B 07.19.17 <br /> � 40-037—OE564 OE564 PARTIAL BASEMENT 120V CONTROL PLAN A 07.19.17 <br /> � 40-037—OE565 OE565 PARTIAL BASEMENT 120V CONTROL PLAN A 07.19.17 �f <br /> �1 EC HA�I CA� • 40-037-3E65 3E65 PARTIAL 3RD FLOOR 208Y/120V POWER PLAN — REFERENCE ONLY <br /> � 40-037—E4G E4G MOTOR CONTROL CENTER A SINGLE LINE DIAGRAM — REFERENCE ONLY <br /> • 40-037—OM110R OM110R PLUMBING BASEMENT PLAN — AREA 10— REMOVAL J 07.19.17 � 40-037—E4H E4H MOTOR CONTROL CENTER B SINGLE LINE DIAGRAM — REFERENCE ONLY <br /> • 40-037—OM 111 R OM11 1 R PLUMBING BASEMENT PLAN — AREA 11 — REMOVAL G 07.19.17 � 40-037—E4N E4N MOTOR CONTROL CENTER J — REFERENCE ONLY <br /> • 40-037—OM112R OM112R PLUMBING BASEMENT PLAN — AREA 12 — REMOVAL H 07.19.17 • 40-037—E4P E4P MOTOR CONTROL CENTER K — REFERENCE ONLY <br /> • 40-037—OM114R OM114R PLUMBING BASEMENT PLAN — AREA 14 — REMOVAL E 07.19.17 • 40-037—E4Q E4Q MOTOR CONTROL CENTER L — REFERENCE ONLY � <br /> • 40-037—OM115R OM115R PLUMBING BASEMENT PLAN — AREA 15 — REMOVAL A 07.19.17 • 40-037—E9A E9A SUB—GRADE COMPOSITE GROUNDING PLAN 07.19.17 � <br /> • 40-037—OM121 R OM121 R PLUMBING BASEMENT PLAN — REMOVAL E 07.19.17 � 40-037—E501 E501 HAZARD CLASSIFICATION BASEMENT FLOOR PLAN — REFERENCE ONLY <br /> • 40-037—OM262R OM262R FIRE PROTECTION BASEMENT PLAN — AREA 12 — REMOVAL D 07.19.17 • 40-037—E509A E509A LIGHT FIXTURE SCHEDULE M 07.19.17 �� <br /> • 40-037—M 1 NR M 1 NR PUMPS AND PLUMBING FIXTURES — REMOVAL F 07.19.17 • 40-037—E540 E540 ELECTRICAL CLOSETS FIRST FLOOR PARTIAL PLANS — 07.19.17 <br /> • 40-037—M4R M4R INDUSTRIAL WASTE SYSTEM FLOW DIAGRAM — REMOVAL C 07.19.17 • 40-037—E542 E542 ELECTRICAL CLOSETS 3RD F�OOR PARTIAL PLANS — REFERENCE ONLY <br /> • 40-037—M527R M527R MECHANICAL SECTIONS WING PLENUM CSBcP —REMOVAL B 07.19.17 • 40-037—E582-1 E582-1 LEAK DETECTION SYSTEM LOCATION PLAN C 07.19.17 <br /> • 40-037—M683R M683R MISC SECTIONS AND DETAILS — REMOVAL A 07.19.17 • 40-037—E582-2 E582-2 LEAK DETECTION SYSTEM RISER DIAGRAM — 07.19.17 <br /> • 40-037—OM110 OM110 PLUMBING BASEMENT PLAN — AREA 10 J 07.19.17 � 40-037—E582-3 E582-3 SUMP LEAK DETECTION PANEL LD1C13 CONT. WRG. DIA. 07.19.17 - <br /> • 40-037—OM111 OM111 PLUMBING BASEMENT PLAN — AREA 11 G 07.19,17 • 40-037—E584 E584 LEAK DETECTION SYSTEM AND TANK DETAILS — 07.19.17 � �'.� <br /> • 40-037—OM112 OM112 PLUMBING BASEMENT PLAN — AREA 12 H 07.19,17 � 40-037—E584-1 E584-1 LEAK DETECTION AND SUMP DETAILS — 07.19.17 t <br /> • 40-037—OM114 OM114 PLUMBING BASEMENT PLAN — AREA 14 E 07.19,17 • 40-037—E587 E587 MOTOR SCHEMATICS: SUMP PUMPS A 07.19.17 <br /> • 40-037—OM115 OM115 PLUMBING BASEMENT PLAN — AREA 15 A 07.19.17 • 40-037—E587-1 E587-1 MOTOR SCHEMATICS SUMP PUMPS — 07.19.17 � <br /> • 40-037—OM121 OM121 PLUMBING BASEMENT PLAN E 07.19.17 • 40-037—E765 E765 FTB-2B1401 A 07.19.17 <br /> • 40-037—M1 N M1 N PUMPS AND PLUMBING FIXTURES F 07.19.17 • 40-037—E766 E766 FTB-2C1402 A 07.19.17 <br /> • 40-037—M4 M4 INDUSTRIAL WASTE SYSTEM FLOW DIAGRAM C 07.19.17 <br /> • 40-037—M527 M527 MECHANICAL SECTIONS WING PLENUM CSBcP B 07.19.17 <br /> • 40-037—M649 M649 MECHANICAL DETAILS A 07.19.17 _ <br /> • 40-037—M649-1 M649-1 MECHANICAL DETAILS ORIG 07.19.17 ;;f�"�� <br /> �F,'', <br /> • 40-037—M649-1 M649-2 MECHANICAL DETAILS ORIG 07.19.17 <br /> � 40-037—M683 M683 MISC SECTIONS AND DETAILS A 07.19.17 <br /> :>:�.. <br /> ::�� <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY E. CRANSTON 01.31.11 DRAWING INDEX W3347480 A 07.19.17 <br /> - 40-37 ELEVATOR BOOTHS - RECORD 10839501 C/ROLLUD 09.26.16 THIS DESIGN AND/OR CHECKED <br /> SPECIFICATION IS APPROVED SHEET • <br /> A 40-37 PAINT CELL SSG SUMP RELIABILITY & SAFETY W3347480 FSi 07.19.17 �0�,�� � APPROVED BY DEPT. DATE ENGINEER TITLE 40-37 PAINT CELL SSG SUMP RELIABILITY 8c SAFETY �`.:: <br /> CHECKED G 2 <br /> APPROVED B U I L D I N G 40�0�� JOB N0. COMP N0. ± <br /> 10839501 <br /> APPROVED ARCHITECTURAL MASTER EVERETT, Wq �'"c No. 40-037—G2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.