|
':�
<br /> �EGE �IDo
<br /> FUTURE CONDUIT
<br /> OFUTURE EQUIPMENT
<br /> — — EMBEDDED CONDUIT
<br /> GE �IERA� NOTESo
<br /> 1 . ALL CONDUITS AND CABLE TRAYS ARE
<br /> SHOWN DIAGRAMMATICALLY. FINAL
<br /> � C g � g H � LOCATIONS SHALL BE ESTABLISHED BASED "
<br /> ON CLEARANCE OF DUCTS AND PIPING
<br /> SYSTEMS.
<br /> 2. ALL CONDUIT SHALL BE 1 " UNLESS . �
<br /> '� 4 NOTED OTHERWISE.
<br /> 3. REFERENCE CABLE AND CONDUIT SCHEDULE
<br /> FOR CIRCUIT ROUTING.
<br /> 1 „C -
<br /> I SP-27 4. REFERENCE SHEET E543 AND E544 '"$' �
<br /> I
<br /> � 7.5Hp, 3Ph O � - - - - - - - - DE AI S OFCABLE T RAYHANDECONDUIT.
<br /> I MCC A ,
<br /> �O 5. ALL CONDUITS SHALL MAINTAIN A
<br /> SP-28 � � MROMUHO� WA ER AND STEAMCPIPR G CE
<br /> I �
<br /> 7.5Hp, 3Ph 068 .
<br /> � MCC B 6. ALL CONDUIT THIS DRAWING SHALL BE
<br /> I PBC-037 RIGID GALVANIZED STEEL (RGS).
<br /> ' N OTES o
<br /> I `� , � �
<br /> I � � REFERENCE SHEETS E534 AND E536
<br /> FOR INSTALLATION OF EMBEDDED
<br /> I � CONDUITS.
<br /> . AHU-3 1 "C PBC-375 HRW-5 I
<br /> - - - - - - Hp, 3ph - - - - - - � 3/4Hp, 3Ph � I � I � I . �
<br /> FUTURE „ MCC B MCC E ( � C O I V STR U CT O I �1 �l OTES e
<br /> PB —062 � � 1 . CONNECT TO EXISTING CONDUIT NEAR COLUMN AND
<br /> M CH. AREA
<br /> OO O 6 ROUTE TO NEW LOCATION OF SUMP PUMPS.
<br /> :�.
<br /> I 2. PULL WIRING FROM JUNCTION BOX TO NEW LOCATION �
<br /> I ( I OF PUMP.
<br /> I � � ( ..
<br /> —� 3. INSTALL SEALTITE AND CONNECT WIRING TO PUMP
<br /> ( MOTOR.
<br /> � �
<br /> --� ___---�� � I '
<br /> �--- __ _ II _—____--�—___
<br /> CONSTRU �TON NOTES
<br /> �___-- � I
<br /> � _-_ � � �__� � PROVIDE AND INSTALL NON-FUSABLE DISCONNECT �
<br /> �— B �� FUTURE ❑ ,-- SWITCH FOR SUMP PUMP. MOUNT ON WALL AT 42" � ,� ;r
<br /> � PLENUM AREA I II� AFF. PROVIDE PHENOLIC LABEL ON DISCONNECT
<br /> ❑ � 007 � SWITCH WITH EQUIPMENT NAME AND MCC NAME
<br /> � I AND COMPARTMENT. ••.
<br /> I
<br /> 1 � I
<br /> 2 � B 2�- INSTALL JUNCTION BOX ON COLUMN AT 6 AFF OR
<br /> PBC-038 � 0 1 LESS. INTERCEPT EXISTING CONDUIT AND REDIRECT
<br /> PBC-044 — — � I TO JUNCTION BOX. PULL EXISTING MOTOR FEEDERS �
<br /> J — —
<br /> � —'�--- — _ — — � ��� PBC-244 � TO JUNCTION BOX. SCHEDULE FIELD WALK WITH
<br /> BOEING AND ENGINEER PRIOR TO INSTALLATION OF
<br /> —069 2 � —° � PLEN M AR JUNCTION BOX. `�
<br /> :> ��
<br /> „
<br /> 0 0 9 '�F�" ,
<br /> 1 � i � � SP— � � � PROVIDE AND INSTALL CONDUIT FROM JUNCTION
<br /> 1
<br /> — 1 SP-25 O O SHp, P BOX TO DISCONNECT SWITCH. IF THE EXISTING
<br /> � 6 p, 3Ph I, 30 30 � � MCC � CONDUCTORS ARE OF SUFFICIENT LENGTH THEN
<br /> � M C A j 3 NF NF�--- 5Hp, 3P Pg�_ � � I _ PULL EXISTING MOTOR FEEDERS AND TERMINATE TO
<br /> � I 2"C �'�' _ � _ MCC L � -_______ __--� ELIMINATE SPLICES. IF THE CONDUCTORS ARE NOT
<br /> � HRW 6 � »� PBC-328 --- OF SUFFICIENT LENGTH THEN SPLICE AT NEW �
<br /> s .
<br /> L I MCCHp, 3Ph O _ _ I JUNCTION BOX. SCHEDULE FIELD WALK WITH
<br /> �.
<br /> �� SP-5 SF�-6 � � FUTURE BE�EDERSAND ENGINEER PRIOR TO SPLICING MOTOR
<br /> 0 3 5Hp, 3Ph 4 4 �
<br /> ,.,:� :
<br /> r MCC A ( 4� INSTALL CONDUIT FROM DISCONNECT SWITCH TO �
<br /> �' MOTOR. INSTALL SEAL TITE SPARINGLY, MAXIMUM
<br /> 0
<br /> �
<br /> �� OF 36", TO TRANSITION FROM MOTOR TO
<br /> 2-1/2", 3 EACH—BELDEN� ME H. A A >> � � GALVANIZED RIGID STEEL COND �
<br /> = 29536, 3090CE, �
<br /> 3/4 , INTRINSICALLY �, UIT. PULL NEW
<br /> 0 3/4", INTRINSICALLY 3088CE, 1475A �� HRW_� SAFE—(3) BELDEN 1475A, � w CONDUCTORS AND TERMINATE.
<br /> T I o SAFE—(3) BELDEN 1475A, AND (2) #14G 3/4Hp, 3Ph (18) #14, #14G I 29536, 090CEH—BELDEN� J I � '
<br /> — � (18) �14, �14G MCC N � = R A B c �
<br /> ° �, W PBC-335 � ��� 3088CE, 1475A � �,
<br /> �� I � —
<br /> � J � ��r r p - - � — - - - - AND (2) �14G QIW
<br /> E z �� �' � � �—�_ � � � 14 _
<br /> � Z � i��, � �
<br /> i i � �--_ — ,
<br /> �, ;,� , � FUTURE -_ ,'iy .,
<br /> M Q Lw ;�'� � '' '�� — � ' -- OE110 OE111 OE112 13 s
<br /> I � (j '� � -� �
<br /> � ; �_—J -----_I' MATC \ �
<br /> �, � H LINE �� ' �—_ I I
<br /> m SEE SHT. OE114 OE113 I OE114 I OE115 12
<br /> � — — — —
<br /> � .
<br /> � OE116 OE117 OE118 11 �
<br /> o — — °
<br /> I
<br /> � OE119 OE120 OE121
<br /> � 10
<br /> � PART A� 27 � 480� POWER P �AN �. �Y�
<br /> .o KEY P�AN
<br /> � SCALE: 1/8" =1 '-0" N '
<br /> �
<br /> N.T.S.
<br /> �
<br /> w SCALE: 1/8"=1 '-0"
<br /> � .
<br /> CASNE ENGINEER/NG, iNC.
<br /> 0 2� 4� 8� � 6� � E 10604TNEC38t�P�.,T SUI TE�05 K RK�AND, WA 98033
<br /> SS U E D F C�R C O I�S T R U C T I O N (425) 522-1000 WWW.CASNE.COM JOB N0. 161-099 �
<br /> � SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE � ' � DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
<br /> � �� oF wAs� �� ACCEPTABILITY PARTIAL BASEMENT
<br /> - RECORD DWG. - LOCKWOOD GREENE 03.94 q��' I��� THIS DESIGN AND/OR CHECKED 277/480V POWER PLAN W3347480 B 07.19.17
<br /> N �,�' o SPECIFICATION IS APPROVED SHEEi
<br /> � A 777 AUTOMATED SPRAY MEfHOD DESIGN 11572815 CASNE DFW 04.26.13 �Q�,�� PROVED BY DEPT. DATE ENGINEER TITLE 40-37 PAINT CELL SSG SUMP RELIABILITY & SAFETY � ;:�t...�",*
<br /> B 40-37 PAINT CELL SSG SUMP RELIABILIT`( & SAFETY W3347480 CASNE 07.19.17 CHECKED 0 E 111
<br /> � BUILDING 40-37
<br /> �
<br /> � ��O h' 29170 �, �� APPROVED JOB N0. COMP N0.
<br /> � ��s I�NAL ��1� 1� APPROVED DWG o. 11572815 ;
<br /> � o���� ELECTRICAL MASTER COL. B—C/13-14 EVERE�, WA N 40-37—OE111
<br />
|