Laserfiche WebLink
� i.� <br /> (��'���.1�'; _ __ <br /> �EGENDo <br /> �,k <br /> FUTURE CONDUIT � <br /> FUTURE EQUIPMENT „ <br /> �— — EMBEDDED CONDUIT <br /> GENERA� NOTESo . � <br /> � <br /> 1 . ALL CONDUITS AND CABLE TRAYS ARE <br /> SHOWN DIAGRAMMATICALLY. FINAL � <br /> LOCATIONS SHALL BE ESTABLISHED BASED <br /> ON CLEARANCE OF DUCTS AND PIPING <br /> I � SYSTEMS. � <br /> ' 2. ALL CONDUIT SHA�L BE 1 " UNLESS , <br /> NOTED OTHERWISEI. <br /> � _ � _ —� — — — — — — 3. REFERENCE CABL� AND CONDUIT SCHEDULE <br /> 2T066 UP FOR CIRCUIT ROUTING. <br /> � SEE SHT 3E11 � 4. REFERENCE SHEET E543 AND E544 <br /> FOR INSTALLATION AND HANGER <br /> _ � 0 � � � — � � — � � � � 2T082 ST I �;2 DETAILS OF CABL i TRAY AND CONDUIT. � <br /> TO 480V BOTTOM TRAY , <br /> r` `� � � � � � � � � � � � TRAY g4 —� f 5. ALL CONDUITS SHALL MAINTAIN A ��x �; <br /> � MINIMUM OF TWEL�E INCHES CLEARANCE <br /> FUTURE SP-15 Op Op SP-16 � I 1 "C, 3�6, 6�14, �10G FROM HOT WATER AND STEAM PIPING. • <br /> 7.5 Hp, 3 P h 7.5 Hp, 3 P h 24" T AY 6. ALL C O N D U I T T H I S D R A W I N G S H A L L B E <br /> MCC L MCC J • Hp, Ph RIGID GALVANIZED STEEL (RGS). <br /> PBC-266 TO 480V T 3T082 TO 480V TRAY C K <br /> 1 "C „ BOTTOM OF TRAY I VF 7. ALL CONDUITS ANQ RACEWAYS, PENETRATING <br /> � � � I I 95�_�>> I Op I F-1 WALLS AND FLOORS DESIGNED AS FIRE <br /> BARRIERS, SHALL BE SEALED PER <br /> PBC-236 PBC-206 JOG SECTION 300-21 OF THE NEC. <br /> o _ <br /> 3T066 UP • - <br /> P-9 SP-10 PBC-253 SEE SHT 3 112 EX R E F E R E C E D RAW �l G S < , <br /> �5Hp, 3Ph 5Hp, 3Ph 3 � „ SF-15 � PBC-1 9 60� � 1� REFERENCE SHEE�S E534 AND E536 <br /> MCC J MCC K 2 � 2 50H , 3Ph 3 FOR INSTALLATION OF EMBEDDED „ <br /> PBC-235 � 2 MCCpJ/VFD O OH 3Ph CONDUITS. <br /> � "� � 30 1 _ PBC-198 O CC �`� <br /> AHU-5 4 NF� 3 3 _ PBC 265 1 1 2"� C 0 STR U CT 0 f� OTES o <br /> � PBC 265 � I I <br /> 10Hp, 3Ph � N� � I 1 1/2 C � I 1 . CONNECT TO EXISTIf�G CONDUIT NEAR COLUMN AND <br /> R O U T E T O N E W L O C A T I O N O F S U M P P U M P S. <br /> MCC L O 4 . <br /> 2. PULL WIRING FROM JUNCTION BOX TO NEW LOCATION OF ' :.�¢�:� <br /> � I PUMP. � <br /> „ I <br /> � _ i _ _ _ 2 � _ _ — — 3. INSTALL SEALTITE AND CONNECT WIRING TO PUMP ;, <br /> � � "� MOTOR. <br /> � � � , <br /> HV-42 PBC-304 � C 0 N STR U CT 0 f� N OTES . <br /> � — � � 30H , 3Ph I PBC-292 <br /> � P 1 , PROVIDE AND INSTALL NON—FUSABLE DISCONNECT <br /> MCC L SF-9 O 2"C SWITCH FOR SUMP PUMP. CONSTRUCT AND MOUNT <br /> ---- I 1 "C O 75H 3Ph DISCONNECT SWITCH ON STRUT SUPPORT AT 42" AFF. � - , <br /> O °° MCC p�P PROVIDE PHENOLIC LABEL ON DISCONNECT SWITCH ` �<:�-� <br /> � / 2C , <br /> D \ PBC-176 S 12 I WITH EQUIPMENT �NAME AND MCC NAME AND <br /> I � � _ � O 75H , 3Ph � COMPARTMENT. ; <br /> �" M 2 MCC 'N <br /> �a� 60Hp, 3Ph 2� INSTALL JUNCTIONi BOX ON COLUMN OR WALL AT 6' <br /> MCC J WING JACK I.S. JB AFF OR LESS. INTERCEPT EXISTING CONDUIT AND <br /> _ _ _ _ _ _ _ �� REDIRECT TO JUN�CTION BOX. PULL EXISTING MOTOR . <br /> � FEEDERS TO JUN�TION BOX. SCHEDULE FIELD WALK <br /> � WITH BOEING AND� ENGINEER PRIOR TO INSTALLATION <br /> PBC-305 PBC-239 OF JUNCTION BOX. _ <br /> WING JACK POWER JB , � <br /> >.., <br /> � PROVIDE AND INS�ALL CONDUIT FROM JUNCTION BOX � _ <br /> SF-10 � »� SVP-2 TO DISCONNECT SWITCH. IF THE EXISTING <br /> � � I p I CONDUCTORS AR� OF SUFFICIENT LENGTH THEN PULL „ <br /> 75Hp, 3Ph 0 1 .5Hp, 3Ph <br /> MCC P MCC L EXISTING MOTOR FEEDERS AND TERMINATE TO <br /> SP-50 B -207 ELIMINATE SPLICES. IF THE CONDUCTORS ARE NOT OF <br /> �, 7.5H , 3Ph SF-1 1 � SUFFICIENT LENG�H THEN SPLICE AT NEW JUNCTION <br /> 3 p BOX. SCHEDULE IELD WALK WITH BOEING AND <br /> N I O MCC K I 1 "C 75Hp, 3Ph p � � ENGINEER PRIOR TO SPLICING MOTOR FEEDERS. <br /> � � MCC N O <br /> 0 2 » � <br /> ,� Op 4�j INSTALL CONDUIT FROM DISCONNECT SWITCH TO : <br /> �' MOTOR. INSTALL � EAL TITE SPARINGLY, MAXIMUM OF . .,> � <br /> o _ _ _ _ _ � _ PR(;—�91 _ — SF_� — 36", TO TRANSITION FROM MOTOR TO GALVANIZED " <br /> � 2-1/2", 3 EACH—BELDEN� I SP-49 I I RIGID STEEL CON �DUIT. PULL NEW CONDUCTORS AND <br /> .3 w � I PBC-267 75Hp, 3Ph TERMINATE. �� <br /> � 29536, 3090CE, 7.5H 3Ph p MCC Q <br /> o z �, 3/4 , INSTRINSICALLY 3088CE, 1475A MCC pJ O <br /> � � � SAFE—(3) BELDEN 1475A, AND (2) �14G I � <br /> T � <br /> " _ (18) �14, �14G A B C <br /> �— <br /> � � S —6 <br /> �° � ,�, HRW-11 PBC-296 � � PBC-330 <br /> �Cp, Ph 14 <br /> � "' � 3/4Hp, 3Ph � O � „� Q � <br /> �, -__�_ M C C N O E 1 1 0 O E 1 1 1 O E 1 1 2 <br /> � — — � 3 _. <br /> � � <br /> M � <br /> ,$ " <br /> � MATCH LINE OE113 � OE114 � OE115 i` <br /> � 12 <br /> m SEE SHT. OE115 I I <br /> `` PBC-317 OE11I6 OE117 OE118 � <br /> � _ _ 11 <br /> � OE11I9 OE120 OE121 <br /> � <br /> � 10 � <br /> ' PART A� 277 480� POWER P �AN <br /> � � <br /> � SCALE: 1/8" =1 '-0" K�Y PLAN <br /> .� <br /> o . <br /> L <br /> � <br /> N IT.S. <br /> i <br /> � . <br /> W SCALE: 1/8"=1 '—0" ' <br /> � � <br /> - CASNE ENGINEERING, INC. <br /> ELECTRICAL AND TECHNOLOGY CONSULTANTS <br /> � 2� 4� 8' 16� I�S U E D F O R C U N S T R U C T I O N 10604 NE 38t1j PL., SUITE 205 KIRKLAND, WA 98033 . <br /> (425) 522-10q0 WWW.CASNE.COM JOB N0. 161-099 <br /> � SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE .�1 ' .j� DRAWN DATE SUBTITLE CURRENT REVISION I SYMBOL DATE <br /> q�� °F �As�f��'� H SC ESGN B DI R CHECKED PARTIAL BASEMENT W33474�a D o�.�9.� � <br /> — RECORD DWG. — LOCKWOC�� GREENE 03.94 �, .� 277/480V POWER PLAN SHEEf <br /> � <br /> ti o SPECIFICATION IS APPROVED ENGINEER TITLE 40-37 PAINT CELL SSG SUMP RELIABILITY 8c SAFETY I <br /> � A HEX CHROME REDUCTION: 777-41/43 102506-00 CASNE 11.23.10 �0�,�� PROVED BY DEPT. DATE <br /> CD B 777 ASM 11572815 CASNE DFW 04.26.13 CHECKED <br /> �'� 29170 � '�'� APPROVED 6 U I L D I N G 40�� I JOB No. 1025066 COMP N0. � `'y.• <br /> � C REPLACE HCS 9 & 10 — RECORD W1742988 CASNE/FSI DFW 09.20.13 ��',���GISTE¢ ti�' , <br /> � D 40-37 PAINT CELL SSG SUMP RELIABILITY & SAFETYW3347480 CASNE 07.19.17 ss10NAL �o��qli� APPROVED ELECTRICAL MASTER C—D/13-14 EVERETT, I�Iq °wc No. 40-37—OE112 <br /> � <br />