� i.�
<br /> (��'���.1�'; _ __
<br /> �EGENDo
<br /> �,k
<br /> FUTURE CONDUIT �
<br /> FUTURE EQUIPMENT „
<br /> �— — EMBEDDED CONDUIT
<br /> GENERA� NOTESo . �
<br /> �
<br /> 1 . ALL CONDUITS AND CABLE TRAYS ARE
<br /> SHOWN DIAGRAMMATICALLY. FINAL �
<br /> LOCATIONS SHALL BE ESTABLISHED BASED
<br /> ON CLEARANCE OF DUCTS AND PIPING
<br /> I � SYSTEMS. �
<br /> ' 2. ALL CONDUIT SHA�L BE 1 " UNLESS ,
<br /> NOTED OTHERWISEI.
<br /> � _ � _ —� — — — — — — 3. REFERENCE CABL� AND CONDUIT SCHEDULE
<br /> 2T066 UP FOR CIRCUIT ROUTING.
<br /> � SEE SHT 3E11 � 4. REFERENCE SHEET E543 AND E544
<br /> FOR INSTALLATION AND HANGER
<br /> _ � 0 � � � — � � — � � � � 2T082 ST I �;2 DETAILS OF CABL i TRAY AND CONDUIT. �
<br /> TO 480V BOTTOM TRAY ,
<br /> r` `� � � � � � � � � � � � TRAY g4 —� f 5. ALL CONDUITS SHALL MAINTAIN A ��x �;
<br /> � MINIMUM OF TWEL�E INCHES CLEARANCE
<br /> FUTURE SP-15 Op Op SP-16 � I 1 "C, 3�6, 6�14, �10G FROM HOT WATER AND STEAM PIPING. •
<br /> 7.5 Hp, 3 P h 7.5 Hp, 3 P h 24" T AY 6. ALL C O N D U I T T H I S D R A W I N G S H A L L B E
<br /> MCC L MCC J • Hp, Ph RIGID GALVANIZED STEEL (RGS).
<br /> PBC-266 TO 480V T 3T082 TO 480V TRAY C K
<br /> 1 "C „ BOTTOM OF TRAY I VF 7. ALL CONDUITS ANQ RACEWAYS, PENETRATING
<br /> � � � I I 95�_�>> I Op I F-1 WALLS AND FLOORS DESIGNED AS FIRE
<br /> BARRIERS, SHALL BE SEALED PER
<br /> PBC-236 PBC-206 JOG SECTION 300-21 OF THE NEC.
<br /> o _
<br /> 3T066 UP • -
<br /> P-9 SP-10 PBC-253 SEE SHT 3 112 EX R E F E R E C E D RAW �l G S < ,
<br /> �5Hp, 3Ph 5Hp, 3Ph 3 � „ SF-15 � PBC-1 9 60� � 1� REFERENCE SHEE�S E534 AND E536
<br /> MCC J MCC K 2 � 2 50H , 3Ph 3 FOR INSTALLATION OF EMBEDDED „
<br /> PBC-235 � 2 MCCpJ/VFD O OH 3Ph CONDUITS.
<br /> � "� � 30 1 _ PBC-198 O CC �`�
<br /> AHU-5 4 NF� 3 3 _ PBC 265 1 1 2"� C 0 STR U CT 0 f� OTES o
<br /> � PBC 265 � I I
<br /> 10Hp, 3Ph � N� � I 1 1/2 C � I 1 . CONNECT TO EXISTIf�G CONDUIT NEAR COLUMN AND
<br /> R O U T E T O N E W L O C A T I O N O F S U M P P U M P S.
<br /> MCC L O 4 .
<br /> 2. PULL WIRING FROM JUNCTION BOX TO NEW LOCATION OF ' :.�¢�:�
<br /> � I PUMP. �
<br /> „ I
<br /> � _ i _ _ _ 2 � _ _ — — 3. INSTALL SEALTITE AND CONNECT WIRING TO PUMP ;,
<br /> � � "� MOTOR.
<br /> � � � ,
<br /> HV-42 PBC-304 � C 0 N STR U CT 0 f� N OTES .
<br /> � — � � 30H , 3Ph I PBC-292
<br /> � P 1 , PROVIDE AND INSTALL NON—FUSABLE DISCONNECT
<br /> MCC L SF-9 O 2"C SWITCH FOR SUMP PUMP. CONSTRUCT AND MOUNT
<br /> ---- I 1 "C O 75H 3Ph DISCONNECT SWITCH ON STRUT SUPPORT AT 42" AFF. � - ,
<br /> O °° MCC p�P PROVIDE PHENOLIC LABEL ON DISCONNECT SWITCH ` �<:�-�
<br /> � / 2C ,
<br /> D \ PBC-176 S 12 I WITH EQUIPMENT �NAME AND MCC NAME AND
<br /> I � � _ � O 75H , 3Ph � COMPARTMENT. ;
<br /> �" M 2 MCC 'N
<br /> �a� 60Hp, 3Ph 2� INSTALL JUNCTIONi BOX ON COLUMN OR WALL AT 6'
<br /> MCC J WING JACK I.S. JB AFF OR LESS. INTERCEPT EXISTING CONDUIT AND
<br /> _ _ _ _ _ _ _ �� REDIRECT TO JUN�CTION BOX. PULL EXISTING MOTOR .
<br /> � FEEDERS TO JUN�TION BOX. SCHEDULE FIELD WALK
<br /> � WITH BOEING AND� ENGINEER PRIOR TO INSTALLATION
<br /> PBC-305 PBC-239 OF JUNCTION BOX. _
<br /> WING JACK POWER JB , �
<br /> >..,
<br /> � PROVIDE AND INS�ALL CONDUIT FROM JUNCTION BOX � _
<br /> SF-10 � »� SVP-2 TO DISCONNECT SWITCH. IF THE EXISTING
<br /> � � I p I CONDUCTORS AR� OF SUFFICIENT LENGTH THEN PULL „
<br /> 75Hp, 3Ph 0 1 .5Hp, 3Ph
<br /> MCC P MCC L EXISTING MOTOR FEEDERS AND TERMINATE TO
<br /> SP-50 B -207 ELIMINATE SPLICES. IF THE CONDUCTORS ARE NOT OF
<br /> �, 7.5H , 3Ph SF-1 1 � SUFFICIENT LENG�H THEN SPLICE AT NEW JUNCTION
<br /> 3 p BOX. SCHEDULE IELD WALK WITH BOEING AND
<br /> N I O MCC K I 1 "C 75Hp, 3Ph p � � ENGINEER PRIOR TO SPLICING MOTOR FEEDERS.
<br /> � � MCC N O
<br /> 0 2 » �
<br /> ,� Op 4�j INSTALL CONDUIT FROM DISCONNECT SWITCH TO :
<br /> �' MOTOR. INSTALL � EAL TITE SPARINGLY, MAXIMUM OF . .,> �
<br /> o _ _ _ _ _ � _ PR(;—�91 _ — SF_� — 36", TO TRANSITION FROM MOTOR TO GALVANIZED "
<br /> � 2-1/2", 3 EACH—BELDEN� I SP-49 I I RIGID STEEL CON �DUIT. PULL NEW CONDUCTORS AND
<br /> .3 w � I PBC-267 75Hp, 3Ph TERMINATE. ��
<br /> � 29536, 3090CE, 7.5H 3Ph p MCC Q
<br /> o z �, 3/4 , INSTRINSICALLY 3088CE, 1475A MCC pJ O
<br /> � � � SAFE—(3) BELDEN 1475A, AND (2) �14G I �
<br /> T �
<br /> " _ (18) �14, �14G A B C
<br /> �—
<br /> � � S —6
<br /> �° � ,�, HRW-11 PBC-296 � � PBC-330
<br /> �Cp, Ph 14
<br /> � "' � 3/4Hp, 3Ph � O � „� Q �
<br /> �, -__�_ M C C N O E 1 1 0 O E 1 1 1 O E 1 1 2
<br /> � — — � 3 _.
<br /> � �
<br /> M �
<br /> ,$ "
<br /> � MATCH LINE OE113 � OE114 � OE115 i`
<br /> � 12
<br /> m SEE SHT. OE115 I I
<br /> `` PBC-317 OE11I6 OE117 OE118 �
<br /> � _ _ 11
<br /> � OE11I9 OE120 OE121
<br /> �
<br /> � 10 �
<br /> ' PART A� 277 480� POWER P �AN
<br /> � �
<br /> � SCALE: 1/8" =1 '-0" K�Y PLAN
<br /> .�
<br /> o .
<br /> L
<br /> �
<br /> N IT.S.
<br /> i
<br /> � .
<br /> W SCALE: 1/8"=1 '—0" '
<br /> � �
<br /> - CASNE ENGINEERING, INC.
<br /> ELECTRICAL AND TECHNOLOGY CONSULTANTS
<br /> � 2� 4� 8' 16� I�S U E D F O R C U N S T R U C T I O N 10604 NE 38t1j PL., SUITE 205 KIRKLAND, WA 98033 .
<br /> (425) 522-10q0 WWW.CASNE.COM JOB N0. 161-099
<br /> � SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE .�1 ' .j� DRAWN DATE SUBTITLE CURRENT REVISION I SYMBOL DATE
<br /> q�� °F �As�f��'� H SC ESGN B DI R CHECKED PARTIAL BASEMENT W33474�a D o�.�9.� �
<br /> — RECORD DWG. — LOCKWOC�� GREENE 03.94 �, .� 277/480V POWER PLAN SHEEf
<br /> �
<br /> ti o SPECIFICATION IS APPROVED ENGINEER TITLE 40-37 PAINT CELL SSG SUMP RELIABILITY 8c SAFETY I
<br /> � A HEX CHROME REDUCTION: 777-41/43 102506-00 CASNE 11.23.10 �0�,�� PROVED BY DEPT. DATE
<br /> CD B 777 ASM 11572815 CASNE DFW 04.26.13 CHECKED
<br /> �'� 29170 � '�'� APPROVED 6 U I L D I N G 40�� I JOB No. 1025066 COMP N0. � `'y.•
<br /> � C REPLACE HCS 9 & 10 — RECORD W1742988 CASNE/FSI DFW 09.20.13 ��',���GISTE¢ ti�' ,
<br /> � D 40-37 PAINT CELL SSG SUMP RELIABILITY & SAFETYW3347480 CASNE 07.19.17 ss10NAL �o��qli� APPROVED ELECTRICAL MASTER C—D/13-14 EVERETT, I�Iq °wc No. 40-37—OE112
<br /> �
<br />
|