Laserfiche WebLink
• 1• • *- <br /> 8. Summit Avenue Extension - 19th Street to East Grand, widen and <br /> pave to allow traffic to have the best possible access between <br /> 19th Street and the Interstate Highway. <br /> 9. 19th Street - Walnut to Summit Avenue, widen and pave to provide <br /> smooth freeway interchange traffic flow. <br /> 10. 23rd Street - Rucker Avenue to East Grand Avenue, widen and pave <br /> to provide adquate East-West traffic flow. <br /> 11. Rucker Avenue - California Street to 26th Street, widen, pave and <br /> channelize to provide safer traffic flow. <br /> 12. Rucker Avenue,- 43rd Street to Pacific Avenue, widen, pave and <br /> channelize to accommodate exceptionally heavy traffic in future <br /> from 41st Street Interchange and South Everett. <br /> 13. Everett Avenue - Norton Av nue to Broadway, widen and pave to <br /> facilitate crosstown traffid. <br /> 14. Federal Avenue Extension - Weyerhaeuser Mill to California Street, <br /> construct, widen and pave tcti provide a much needed safe and adequate <br /> access to waterfront properties. <br /> 15. Maple Street - Pacific to Hewitt, widen and pave to accommodate <br /> Hewitt Avenue Freeway Interchange traffic. <br /> 16. Pacific Avenue Extension - Walnut to Hewitt Avenue, widen and pave <br /> to eliminate congestion at freeway ramps on Pacific Avenue. <br /> 17. 35th Street - Federal Avenue to Rucker Avenue, widen and pave to <br /> provide better traffic service. <br /> 18. 52nd Street - Colby to Broadway, widen and pave for better traffic <br /> service. <br /> 19. Lowell-Larimer Corner Road - Lincoln Street South to existing City <br /> Limits, widen and pave to provide safer and smoother traffic flow for the <br /> Lowell Area. <br /> 20. Beverly Boulevard and Colby Avenue - 52nd Street to Broadway, widen <br /> and pave to provide for incieased traffic flow of anticipated growth <br /> in South Everett. <br /> 21. Madison Avenue - Evergreen Way to Broadway, widen and pave to provide <br /> for smoother traffic flow. <br /> 22. Madison Avenue and Glenwooc Avenue - Evergreen Way to Mukilteo <br /> Boulevard, widen and pave or future anticipated heavier traffic flow. <br /> 23. Beverly Lane and Dogwood Drive - Casino Corner to Mukilteo Boulevard, <br /> widen and pave to provide smoother traffic flow and improve alignment <br /> of the intersection of Dogwood Drive and Mukilteo Boulevard. <br /> 24. Pecks Drive - Beverly Lane to Evergreen Way, widen and pave to pro- <br /> vide smoother flow of traffic between Beverly Lane and Evergreen Way. <br /> 25. Casino Road - Evergreen Way to Beverly Boulevard, widen and pave to <br /> provide necessary safety and smoother flow of traffic. <br /> 26. Everett Avenue - Walnut to East Grand, widen and pave to facilitate <br /> traffic movement at freeway interchange. <br /> 1 <br /> - 2 - <br />