Laserfiche WebLink
Kelsey Heyd <br /> From: Allan Giffen <br /> Sent: Tuesday,April 17, 2018 3:00 PM <br /> To: Kelsey Heyd <br /> Subject: RE: B1804-013 - 3927 Rucker Ave - Planning Corrections <br /> Hi Kelsey–We can use this narrative to approve and exception to item 3 without running it through a modification <br /> process. I agree with their analysis. <br /> 07:77. Thank you. <br /> Allan Giffen <br /> Director <br /> Community Planning and Economic Development <br /> P:425.257.8725 <br /> E: agiffen@everettwa.gov <br /> 2930 Wetmore Avenue,Suite 8A, Everett,WA 98201 <br /> www.everettwa.gov <br /> NOTICE: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure <br /> pursuant to the Public Records Act. <br /> From: Kelsey Heyd <br /> Sent: Monday,April 16, 2018 2:18 PM <br /> To:Allan Giffen <AGiffen@everettwa.gov> <br /> Subject: FW: B1804-013-3927 Rucker Ave- Planning Corrections <br /> Hi Allan, <br /> I'd like some input/direction regarding this. For some background: the Everett Clinic is looking to replace the existing <br /> siding of the Gunderson Building with EIFS.The work is considered a minor exterior remodel per Code but the <br /> description for minor remodels includes replacing a building façade's siding as an example of when it should meet <br /> applicable standards. EMC 19.31B.080.F has specific requirements for EIFS: <br /> c. Requirements for Exterior Insulation and Finish System (EIFS)and Similar Troweled Finishes. <br /> (1) To avoid deterioration, EIFS should be trimmed and/or should be sheltered from extreme weather by roof <br /> overhangs or other methods. <br /> (2) EIFS may only be used in conjunction with other approved building materials. <br /> (3) EIFS is prohibited within two vertical feet of the sidewalk or ground level. <br /> They've provided the attached request(with example images)as to why they would like to be exempt from point 3 <br /> above—do you think the information they've provided is sufficient? If so, do we need a land use project/decision <br /> documenting approval? (I don't believe this section of the E-1MUO chapter is included in the typical REVII E-1MUO <br /> design modification process.) <br /> Thanks, <br /> 1i (. ' <br />