Laserfiche WebLink
' 1400 Taylor-Evolution Architecture Field Review Report. ' <br /> millage will attain the 12 mill thickness. They are wet gauge testing as <br /> they go and we will be checking progress and conformance each day. <br /> There are a very few areas with pin holes,Sheathing exposed at small <br /> gaps and some of the joint reinforcing is not full filled. JJ will be going <br /> back over policing the area and we will back inspect on our daily job site <br /> inspections. <br /> 2.8 Sheathing Corner repair/ ' : Confirm that the foam fill used at <br /> WRB base 1; the corners is an acceptable <br /> substrate for the manufacturer's <br /> WRB materials. <br /> '11 4w, Prefer a tooled sealant joint at this <br /> \ilep <br /> location. <br /> 2.9 Electrical Box Flashing The Prosoco fluid applied flashing <br /> materials will be applied to the <br /> electrical box and other similar <br /> penetrations,reaching back onto <br /> the WRB materials to sufficient <br /> bond. <br /> 4,,_ 'tkir.. <br /> 2.10 Window Jamb to Sill 11 t • J trim at jamb will be held <br /> flashing at flush windows off to provide a 3/4"rod <br /> • and sealant joint. <br /> • Prosoco fluid applied <br /> flashing will be applied <br /> prior to setting the flashing <br /> • Tab J trim below sill metal <br /> to complete joint. <br /> 6264 ELLIS AVE S,SEATTLE,WA 98108 INFO@EVOLUTIONARCHITECTURE.NET <br />