Laserfiche WebLink
1400 Taylor-Evolution Architecture Field Review Report <br /> 2.11 —Coping flashing at low Clean out existing sill sealant at <br /> roof parapet to side wall joint and confirm flashing boot <br /> conditions dimensions and layering to <br /> existing.Configuration is generally <br /> as indicated below. <br /> 2.12: Gutter and Downspout These elements,the entry awning <br /> adjustments at upper and lower gutter and downspout will both <br /> awnings need to be removed and reset at to <br /> the datum of the new rigid <br /> insulation. <br /> The gutter will have to be shifted <br /> over approximately 1 to 2"—verify <br /> in field. <br /> Some modifications to the down <br /> spouts will be required to reinstall <br /> to the new insulation thicknesses. <br /> Field Notes#01 Comments: <br /> 1.1 WRB application/ 10 year The 10-year warranty applies to those areas where the approved system is Closed <br /> warranty applied. In the instance where the existing windows are left in place and <br /> WRB materials are not able to be applied,the warranty will exclude these <br /> elements as they may relate to any contribution to any future failure. The <br /> likelihood of failure at the existing window rough opening is minimal in <br /> these circumstances where the vast majority of the windows are well <br /> recessed into the interior wall. <br /> 1.2 Return wall condition at We agreed to reduce the insulation thickness at the return wall to I"or as Open <br /> recessed windows and Prosoco required to allow for a face out 3/4"sealant joint at the jamb conditions. <br /> application at jamb returns This may apply to the head return condition depending on individual <br /> dimensional circumstances. <br /> The framing at these conditions should also be coated with Prosoco liquid <br /> flashing to supplement the termination at these locations. <br /> 5\I <br /> 6264 ELLIS AVE S,SEATTLE,WA 98108 INFO@EVOLUTIONARCHITECTURE.NET <br />