My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3927 RUCKER AVE BASE FILE 2019-09-24
>
Address Records
>
RUCKER AVE
>
3927
>
BASE FILE
>
3927 RUCKER AVE BASE FILE 2019-09-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:41:11 AM
Creation date
9/24/2019 10:41:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3927
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1 400 Taylor-Evolution Architecture Field Review Report <br /> 1.3 Sloped Sill No rigid insulation is required at the sloped sill,allowing the specified Open <br /> metal cladding to fit existing conditions—A field mock up will be <br /> implemented prior to installation. <br /> 1.4 Wall insulation There are areas of the existing wall where there is either no insulation or Closed <br /> the original installation has fell of into the interstitial cavity leaving areas <br /> of the existing wall uninsulated. Contractor shall install new batt <br /> insulation matching the existing materials in all areas where it is missing <br /> and re-attach existing materials with an industry acceptable method. <br /> Contractor has brought in a specialist sub to implement this segment of the <br /> work. <br /> 1.5 Conditions at MRI coolant We agreed that the existing vertical supports would remain at their current <br /> line cover datum of approximately 1.5"above the top of the cover—the gap over the <br /> cut EIFS will be filled with foam insulation and the new cap flashing will <br /> be adjusted accordingly. <br /> 1.6 Sign box The existing sign box needs to be removed and the new EIFS system Open <br /> installed intact at this area. Any reinstallation or new sign box will need <br /> to be mounted on targets on top of the new EIFS system. <br /> We request that the Owner's signage contractor is brought to the table to <br /> establish the remounting requirement. <br /> 1.7 Canopy flashing and existing • A new through wall drainable flashing will be installed over the Open <br /> EIFS peak roof condition at the existing canopies. <br /> • We are anticipating that the new roof cladding will be all metal <br /> eliminating the current kalwall materials. <br /> • The existing EIFS will be overlaid with new insulation and finish <br /> to match the plane of the new materials that will be brought to the <br /> transition point. This area is completely under cover and does <br /> not materially affect the warranty as noted above. <br /> -,. 111! <br /> '.,k dr *ata' <br /> .r. .41111,_ <br /> _..n�u _ Hw <br /> / ^1 4 {9 <br /> ! 1 r <br /> r i <br /> 1.8 Finish and sealant colors The following colors have been selected for materials as noted below: Closed <br /> Metal Flashings and Copings <br /> • Cool dark bronze for the roof coping— <br /> • Cool Sierra Tan for all of the other sloped metal and exposed <br /> metal flashings that are either in the field or at the edge of the <br /> lighter color. <br /> ((a0 <br /> 6264 ELLIS AVE S,SEATTLE,WA 98108 INFO@EVOLUTIONARCHITECTURE.NET <br />
The URL can be used to link to this page
Your browser does not support the video tag.