Laserfiche WebLink
' 1 400 Taylor-Evolution Architecture Field Review Report <br /> 1.3 Sloped Sill No rigid insulation is required at the sloped sill,allowing the specified Open <br /> metal cladding to fit existing conditions—A field mock up will be <br /> implemented prior to installation. <br /> 1.4 Wall insulation There are areas of the existing wall where there is either no insulation or Closed <br /> the original installation has fell of into the interstitial cavity leaving areas <br /> of the existing wall uninsulated. Contractor shall install new batt <br /> insulation matching the existing materials in all areas where it is missing <br /> and re-attach existing materials with an industry acceptable method. <br /> Contractor has brought in a specialist sub to implement this segment of the <br /> work. <br /> 1.5 Conditions at MRI coolant We agreed that the existing vertical supports would remain at their current <br /> line cover datum of approximately 1.5"above the top of the cover—the gap over the <br /> cut EIFS will be filled with foam insulation and the new cap flashing will <br /> be adjusted accordingly. <br /> 1.6 Sign box The existing sign box needs to be removed and the new EIFS system Open <br /> installed intact at this area. Any reinstallation or new sign box will need <br /> to be mounted on targets on top of the new EIFS system. <br /> We request that the Owner's signage contractor is brought to the table to <br /> establish the remounting requirement. <br /> 1.7 Canopy flashing and existing • A new through wall drainable flashing will be installed over the Open <br /> EIFS peak roof condition at the existing canopies. <br /> • We are anticipating that the new roof cladding will be all metal <br /> eliminating the current kalwall materials. <br /> • The existing EIFS will be overlaid with new insulation and finish <br /> to match the plane of the new materials that will be brought to the <br /> transition point. This area is completely under cover and does <br /> not materially affect the warranty as noted above. <br /> -,. 111! <br /> '.,k dr *ata' <br /> .r. .41111,_ <br /> _..n�u _ Hw <br /> / ^1 4 {9 <br /> ! 1 r <br /> r i <br /> 1.8 Finish and sealant colors The following colors have been selected for materials as noted below: Closed <br /> Metal Flashings and Copings <br /> • Cool dark bronze for the roof coping— <br /> • Cool Sierra Tan for all of the other sloped metal and exposed <br /> metal flashings that are either in the field or at the edge of the <br /> lighter color. <br /> ((a0 <br /> 6264 ELLIS AVE S,SEATTLE,WA 98108 INFO@EVOLUTIONARCHITECTURE.NET <br />