My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3723 RUCKER AVE Geotech Report 2018-01-02 MF Import
>
Address Records
>
RUCKER AVE
>
3723
>
Geotech Report
>
3723 RUCKER AVE Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:41:29 AM
Creation date
9/26/2019 2:38:20 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3723
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />; <br />;_ <br />The pavement aection for lightly loaded traffic or parking areas should <br />t- consist of two inches of Asphalt Surfacieg over four inches uf Crushed Rock <br />� Base or three inches o: Asphalt Treated (APB). Heavier loaded [raffic areas <br />will require thicker sections. We will be pleased to assist you in <br />developing appropriate pavement sections for heavy traffic zones, if r.eeded. <br />1.. <br />i <br />�- <br />� <br />e- <br />Additional Servicea <br />We recommend that Terra Asaociates, Inc, be requested to conduct a general <br />reviev of the final design and r:�ecificetions to verify thet earthwork and <br />foundation recommendations have Ueen properly in[erpreted and implemented in <br />Che design of [he praject. <br />The analyses and recommendations submitted in this report are based upon the <br />date obtained from the test pits excavated on the site. Subsurface <br />conditions different from those observed in the test pits may exist on [he <br />site. The nature and exten[ of such variations may not become known until <br />eonatruction is underway. If variations are then observed, prior to <br />proceeding with constructi.on, Terra Associates, Inc, should be requested [o <br />reevaluete the recommendations presented in this report. <br />� It is also recommended tha[ we be retained to provide geotechnical services <br />during conatruction. Thi.s is to observe compliance with the design concepts, <br />,. specifications, and reconunendations; and to allow design changes in the event <br />j subsurface conditions differ from those anticipated prior tu the start of <br />G construction. We recommend thet Terra Associates, Inc. provide the folloving <br />services during cons[ruction: <br />� (A) Examine all st•ripped and overexcavated subgrade areas prior <br />to the s[art uf earthwork. Observe the proofrolling process. <br />� <br />F <br />Y <br />(B) Examir tll foundation and slab areas prior to :orming and <br />conc:�[e placement to evaluate that adequate foundation <br />support is available. ' <br />(C) Perform field den�ity testing of struc[ui•al fills during <br />placement, and observe the grading and earthWork operation. <br />We recommend that a minimum of [wo working days' notice be given to schedule <br />our services during construction. <br />D.-..:..... l,t.. T �oa n"' a <br />
The URL can be used to link to this page
Your browser does not support the video tag.