My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4418 RUCKER AVE MEDICAL BLDG 2018-01-02 MF Import
>
Address Records
>
RUCKER AVE
>
4418
>
MEDICAL BLDG
>
4418 RUCKER AVE MEDICAL BLDG 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 1:29:52 PM
Creation date
9/30/2019 2:04:11 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4418
Tenant Name
MEDICAL BLDG
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Any relocation of existing gas facilities for this development will be at the developer's sole <br />expense, and requires 90 days minimum notice. Please contact Elaine Babby at (206) <br />224-2018 to coordinate relocation requests. <br />2. The Snohomish County PUD currently has sufficient capacity to serve the proposed <br />development. For further information about the electrical service requirements for this <br />project, please call Kurt Martin of the District's Customer Engineering Office, Everett at <br />258-8291. <br />3. Verizon Northwest has facilities near this location. However, any building entrances must <br />be coordinated at least 60 days in advance. The cost of any relocation of Verizon facilities <br />that is required to construct the new apartments will be at the total expense of the <br />developer. Any relocation will take 60 to 120 days. Please contact Mike Hupf, Engineer at <br />(425) 356-4052 or Mike Bly, Engineer at (425) 356-4034 if you have any questions <br />regarding this building entrance. <br />4. Verizon Northwest will provide service to the site. However, new telephone cable <br />construction will be required in conjunction with the site development. Verizon's <br />engineering will begin when they are notified of your construction schedules and telephone <br />requirements. <br />5. It will be the developer's responsibility to provide a suitable combination of conduit and <br />trenching and/or riser conduit to accommodate Verizon's network communications cable <br />within the complex. Provided that an acceptable combination of conduit and/or trenching <br />is incorporated into the project to accommodate Verizon's entrance cable, there will be no <br />costs to the developer for Verizon's cable. <br />6. If a rearrangement of existing cables on premises or on the right-of-way is necessary, <br />appropriate charges will be estimated and Verizon's Guaranty of Payment from will be <br />forwarded to you for your signature. Prior to commencement of Verizon's engineering for <br />such rearrangement, a deposit will be required. To insure timely telephone service, <br />Verizon requests ninety (90) days lead time for engineering, procurement, and installation <br />of cable and/cr Verizon's equipment. <br />Please contact Michael Hupf, Engineering, at (425) 356-4052 or Mike Bly, t gineer at <br />(425) 356-4034 should you require additional information. <br />SAFSiddiq\W I NW ORD\SEPA\07-040 Schmidt med.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.