My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 9/12/2019 Change Order 3
>
Contracts
>
Capital Contract
>
Faber Construction 9/12/2019 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 10:17:58 AM
Creation date
10/4/2019 10:17:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
9/12/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0001602
Total Compensation
$75,444.70
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No.: Three <br /> Change Order Effective Date: Date of Mayor's Signature <br /> CITY <br /> Attest: Approved As to Form: <br /> VI/1 <br /> 6_,-,.___ , /12..‘,..L_ <br /> Mate r %' City Cle �uf— City Attorney <br /> DDate: <br /> f/i Z [C r Date: 47. (b. l9 <br /> Recommended By <br /> Construction Project Manager (if Engineering Department Director <br /> Manager(if applicable) Manager (if <br /> applicable) applicable) <br /> fr.i R ,-t-Yd.,, ,,,ts, .A,/,4 ,c2,A.1,,,44,,Deit, <br /> Date: Dat Date: Date: <br /> f /��� q(2' << <br /> 7 <br /> CONTRACTOR <br /> ByDate: AvCr 3.,==. , 20lq <br /> ---t\irt—H-Officer <br /> Exhibit A—Description of Changed Work <br /> Change Order No. Three contains a list of additional work that is required to: <br /> (a) Correct unforeseen conditions in the existing site and building. <br /> (b) Correct oversights in the original plans and specifications. <br /> (c) Comply with codes or rulings of building officials, and building inspectors. <br /> (d) Improve the quality of appearance and performance of the site and building. <br /> (e) Events/Circumstances: See Attached Exhibit A Matrix. <br />
The URL can be used to link to this page
Your browser does not support the video tag.