Laserfiche WebLink
Evergreen Branch Library Expansion 8/29/2019 <br /> Change Order No. 3 - Evergreen Branch Library Expansion Exhibit A <br /> No. Construction Change Directives Amount <br /> 1 Cold water Supply piping and wall box addition for staff lounge refrigerator $ 825.61 CO #18 <br /> 2 New Voice/Data Room conduit modifications as required by COE I.T./Elect. $ 4,485.36 CO#22 <br /> 3 Provide new hardware at aluminum door#43 due to added ADA opener requirements $ 4,604.60 CO#29 <br /> 4 Credit for toilet& bath Accessories $ (712.96) CO#33 <br /> 5 Provide & install (2) additional data drops in rooms 21 & 22 $ 972.74 CO #34 <br /> No. Faber Construction, Corp. Change Proposals Amount <br /> 1 Provide & Install wall mounted lavatory in family rest room $ 1,513.03 CO#19r1 <br /> 2 Replace existing restroom water closets, urinals with new code-compliant fixtures &flush valves $ 13,995.83 CO#20 <br /> 3 Provide electrical conduit to OFOI low voltage artwork lighting $ 10,227.26 CO#21 <br /> 4 Provide & install "Artisan" siding by Hardie in lieu of specified beveled cedar siding $ 5,677.97 CO#23 <br /> 5 Relocate plumbing supply line of existing wall hydrant& provide & install new wall hydrant $ 2,938.95 CO#24 <br /> 6 Remove & replace existing floor drains at restrooms due to corroded conditions. $ 4,536.74 CO#25 <br /> 7 Additions & modifications to the casework scope of work per Architectural/Engineering review $ 10,603.42 CO#26 <br /> 8 Re-feed floor circuits at Children's Activity Room $ 2,827.51 CO#27 <br /> 9 Work to install electrical power to the wet/dry pressurization pump, inclusive of the fire alarm $ 9,695.27 CO #28 <br /> 10 Exterior painting downspouts & gutters to match new paint schedule (not shown in bid docs) $ 2,274.24 CO#31 <br /> 11 Provide & install roof new venting for lower roof truss (not shown in construction docs.) $ 979.13 CO#32 <br /> Total: $ 75,444.70 <br />