Laserfiche WebLink
� <br />March 18, 2009 <br />Meg Haley, NCARB, Plans Examiner <br />City of Everett <br />3200 Cedar Street <br />Everett, Washington 98201 <br />� <br />� �� ���M�a�� <br />MAR 2 4 2G09 D <br />CITY OF EVERETT <br />DearMegHaley, �ceu1� �y P•,�-.�.il <br />�, tJ(o.w,�1 <br />Subject: Phase 4- Second Floor Offices and Elevator <br />830 SE Everett Mall Way <br />60901-01�/1 <br />l <br />The following information is in response to your comment email dated March 13, 2009. <br />Structural: Recheck <br />1. See revised stair detail information for both interior and exterior stairs. <br />2. See structurai details provided by HN Lehtinen Engineering. <br />a. Detail thru existing concrete wall for stair extension, same as oreviously <br />submitted detail thru wall at corridor. See origin�.� � esponse comment #4. <br />b. See revised floor frami�g plan. <br />c. A new detail showing the connection of the new �tair risers to the existing landing <br />iraming and concrete wail. <br />3. See structural details provided by HN Lehtinen Engineering. <br />a. Stair tread / riser detailing has been revised to close riser opening. <br />b. Stair width shall be constructed 44" in width per egress requirements. <br />Generel: Recheck <br />1. Completed <br />2. Additional copies of the reduced plans for room-by-room occupancy break down have been <br />included. <br />3. Completed <br />4. Completed. <br />5. Completed _ <br />Fire Resistance Ratings: <br />Completed <br />Exiting: <br />1. Completed <br />2. Completed <br />3. Completed <br />4. Completed. <br />5. Completed. <br />f2 <br />