My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
HARVEST CHRISTIAN CENTER
>
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:08:17 PM
Creation date
10/7/2019 2:52:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Tenant Name
HARVEST CHRISTIAN CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fire Resistance Ratings: <br />✓ 1. Per the requirements of the 2006 IBC the reclassification requested is as foilows: <br />Two story, non-separated used of Type III-A construction with fire sprinkler system thru <br />out. Occupancy types are B(Business) and A-3 (Religious Assembly with accessory <br />religious education use per IBC 508.3.1.3 exception.) <br />Exiting: <br />,1. A total of 3 exists are being provided from the second fioor. One exii is directly to the <br />exterior via a new metal stair system. Per 206 IBC section 1016 and tablP 1016.1 exit <br />access travel distance for B occupancy is 300'-0" with an approved sprinkler system. Also as <br />referenced in General item 1.h of you comment letter for the Paptistery and sound booth <br />permit. <br />,% 2. See full main floor plan. <br />,/3. Please reference letter provided by Church stating use of second floor and understanding of <br />elevator requirements as it relates to square footage maximums of 3000 square feet. <br />✓4. Please see sheet A-1.6 for enlarged Main Floor Plan <br />de�e�J <br />✓5. The opening width is 6'-0" and the haight is proposed to be 7'-0" per IBC section 1003.2.5 <br />er.ception ard section 1008.1, door height. <br />s. Hand rails io be provided on both sides of the stair at +34" AFF of ramp. See detail 1/A-2.2 <br />for stair detail information and sheet A1-1.6 for additional dimensional information. <br />7. All egress illumination and signage is existing and shall remain. The openings into the <br />adjacent assembiy areas are not exits and shall not be identified. <br />Accessibility: <br />1. See sheet A-1.6 for elevator lobby dimensions for upper floor and partial enlarged plan for <br />main floor elevaior. <br />2. Hand rails shall be noted as graspable per previous responses and 2006 IBC section 1012 <br />requirements as applicable, see plans. <br />3. See sheet A2.2 for vision lite dimensions. <br />Two sets of revised documents have been provided with this letter for submittal along with <br />updated code analysis and occupancy calculations. Please call 360-435-5514 or email me at <br />GDP(a�GTE.NET if you have any questions. Thank you for your time and consideration <br />regarding this project. <br />Sincerely, <br />Ruth E. Gonzales, Architect <br />Gonzales Design Partners <br />P.O. Box 97 <br />Arlington, Washington 98223 <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.