Laserfiche WebLink
Final rccheck Ietter for A0901� � 19 New offices ai 2nd Iloor <br />Pagc i of 2 <br />Meg Haley _ �dc� n (�! � <br />From: Meg Haley <br />Sent: Tuesday, March 24, 2009 3:31 PM <br />To: 'gdp@gte.net' <br />Subject: F�: Status of Harvest Christian Center pian review <br />Ruth, <br />My best to you and your husband during these treatments. There are others here at work that have undergone <br />similar treatments and come back to work, after recovering. <br />Alex has been calling once or twice a week, so I am trying to keep him in the loop, and let him know status. Since <br />I will be out the next couple days, the first day I will be able to review it is Monday, just so you know. I thought the <br />elevator was out, but just wanted to make sure, since it was mentioned on the response letter subject line, <br />probably left over from my correction letter. <br />Take care, <br />Meg <br />From: Ruth Gonzales [mailto:gdp@gte.net] <br />Sent: Tuesday, March 24, 2009 3:13 PM <br />To: Meg Haley; dodyssey@hotmail.com <br />Cc: Steve Miller <br />Subject; RE: Status of Harvest Christian Center plan review <br />The elevator is out The space is still there and will be used as storage closets. I will double check the plans and <br />ma e sure any o the "old" terms are removed. Today is my husbands chemo treatment so I will coordinate with <br />the structural engineer tomorrow and get the revised pians in as soon as I have his information. <br />Thanks Ruth <br />-----Original Message----- <br />From: Meg Haley [mailto:MHaley@ci.everett.wa.us] <br />Sent: Tuesday, March 24, 2009 8:28 AM <br />To: gdp@gte.net; dodyssey@hotrnail.com <br />Cc: Steve Miller <br />Subject: Status of Harvest Christian Center plan review <br />Ruth and Alex, <br />Until we receive revised plans for second floor offices and revised pians for the baptistery and baicony, no <br />further action can be taken for plan review for permit. <br />Just to clarify, the elevator has been removed from the plans for the first and second Floor, as I understand <br />it, and we have changed the permit application for the second Floor to be a tenant improvement for offices <br />only. Please remove references to the eievator from the plans and correspundence for clarity, or let me <br />know if I am just not seeing it, or if it has been added back in. <br />Thanks, <br />Meg <br />P1eg Haley, NCARB <br />Engineerin9/Public Seivices � 3Z00 Cedar Street, second floo� � Everett, WA 98201 <br />P: �17_5.2`S7.H51'3 I G nilialcy�:�ci.evaiett.�ea.us I�V: hltp://evemth•:a.org/defaWt.aspx7[D=830 <br />4/17/2009 <br />