My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
HARVEST CHRISTIAN CENTER
>
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:08:17 PM
Creation date
10/7/2019 2:52:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Tenant Name
HARVEST CHRISTIAN CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Second iloor structural calculations required for permit B0901-019 for "fl - NEW SECON... Page 1 of 4 <br />� <br />Meg Haley <br />From: Meg Hal=y <br />Sent: Monday, May 11, 2009 5:08 PM <br />To: 'gdp@gte.neY <br />Cc: 'Harvest Christ;an Center InPI' <br />Subject: RE: Second floor structural calculations required for permit 80901-019 for TI - NEW SECOND <br />FLOOR OFFICES at 830 SE EVERETT MAL� WAY <br />R�th, <br />Sorry it took a while to get back to you on this. You now have the inspection reports for the two permits that have <br />not been issued: sanctuary and halcony plus the second floor officea. You also should have received the <br />inspection report for the religious rooms and nursery, permit number 80801-047, which was issued on 10123/08. <br />In general, work has proceeded on all three permits without matching up to the pians as a whole. Specifically: <br />. The structural information or, all three permits is either incomplete or inaccurate as compared to the as- <br />built condition. No building inspections were scheduled for the issued permit B0801-047. Work has <br />proceeded on permits that have not yet been issued: 80901-018 and -019. <br />. The architectural information on the permits for the religious rooms and second floor were not built as <br />shown on the plans, primariiy around the former elevator location and out from that towards the street. The <br />guards and handrails on both outside exits do not meet code. <br />. There is a new interior window in the nursery that is not shown on the plans and is located in a bearing <br />wall, and will require a header, if the window is to remain in that locat!on. <br />. The sanctuary will need addifional support at the balcony, and the supporting structure for the balcony <br />(beams and columns) also require a tested one-hour fire resistance rating. <br />. We agreed (the Pastor, you and I) that the structural drawings and calc�lations should be revised, <br />collected and submitted as complete and accurate for the permit currently issued, B0801-047, since the <br />one hour fire resistant fleor ceiling assembly cannot be installed untii we have reviewed and stamped the <br />structural framing plans and calculations. <br />• The one hour floor ceiling assembly should also be submitted for thi� B�Ja01-047, since the floor is already <br />constructed. The calculations should take into account the loading of the floor above (dead and live) and <br />the construction (one hour fire resistive), and the roof if the structural support of that has been altered. <br />• The storage wili need to be removed from the second floor corridor overlooking all of the ciassrooms and <br />sanctuary; otherwise, an elevator will be required to the second floor. <br />The building inspectors are going out tomorrow for a consuitation inspection with Pastor Kulakevich and Valerie to <br />discuss how to get the project back on track as far as the permit and inspection process. As I understand it, you <br />will also be going out tomorrow to review the as-built condition for the three permits, and revising drawings to <br />meet code, where the as-built condition varies from the architectural plans suhmitted for permit or issued for <br />permit. <br />That sums up what happened in the field last week. Let me know how you would like to proceed, once you have <br />a chance to get out to the site tomorrow. <br />My best to your husband and your mom. <br />-Meg <br />From: Ruth Gonzales [mailto:gdp@gte.net] <br />Sent: Wednesday, May 06, 2009 3:03 PM <br />To: Meg Haley <br />Subject: RE: Second floor structural calculations required for permit 80901-019 for TI - NEW SECOND FLOOR <br />OFFICES at 830 SE EVEREfT MALL WAY <br />5/ 1 I /2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.