Laserfiche WebLink
Second iloor structural calculations required for permit B0901-019 for "fl - NEW SECON... Page 1 of 4 <br />� <br />Meg Haley <br />From: Meg Hal=y <br />Sent: Monday, May 11, 2009 5:08 PM <br />To: 'gdp@gte.neY <br />Cc: 'Harvest Christ;an Center InPI' <br />Subject: RE: Second floor structural calculations required for permit 80901-019 for TI - NEW SECOND <br />FLOOR OFFICES at 830 SE EVERETT MAL� WAY <br />R�th, <br />Sorry it took a while to get back to you on this. You now have the inspection reports for the two permits that have <br />not been issued: sanctuary and halcony plus the second floor officea. You also should have received the <br />inspection report for the religious rooms and nursery, permit number 80801-047, which was issued on 10123/08. <br />In general, work has proceeded on all three permits without matching up to the pians as a whole. Specifically: <br />. The structural information or, all three permits is either incomplete or inaccurate as compared to the as- <br />built condition. No building inspections were scheduled for the issued permit B0801-047. Work has <br />proceeded on permits that have not yet been issued: 80901-018 and -019. <br />. The architectural information on the permits for the religious rooms and second floor were not built as <br />shown on the plans, primariiy around the former elevator location and out from that towards the street. The <br />guards and handrails on both outside exits do not meet code. <br />. There is a new interior window in the nursery that is not shown on the plans and is located in a bearing <br />wall, and will require a header, if the window is to remain in that locat!on. <br />. The sanctuary will need addifional support at the balcony, and the supporting structure for the balcony <br />(beams and columns) also require a tested one-hour fire resistance rating. <br />. We agreed (the Pastor, you and I) that the structural drawings and calc�lations should be revised, <br />collected and submitted as complete and accurate for the permit currently issued, B0801-047, since the <br />one hour fire resistant fleor ceiling assembly cannot be installed untii we have reviewed and stamped the <br />structural framing plans and calculations. <br />• The one hour floor ceiling assembly should also be submitted for thi� B�Ja01-047, since the floor is already <br />constructed. The calculations should take into account the loading of the floor above (dead and live) and <br />the construction (one hour fire resistive), and the roof if the structural support of that has been altered. <br />• The storage wili need to be removed from the second floor corridor overlooking all of the ciassrooms and <br />sanctuary; otherwise, an elevator will be required to the second floor. <br />The building inspectors are going out tomorrow for a consuitation inspection with Pastor Kulakevich and Valerie to <br />discuss how to get the project back on track as far as the permit and inspection process. As I understand it, you <br />will also be going out tomorrow to review the as-built condition for the three permits, and revising drawings to <br />meet code, where the as-built condition varies from the architectural plans suhmitted for permit or issued for <br />permit. <br />That sums up what happened in the field last week. Let me know how you would like to proceed, once you have <br />a chance to get out to the site tomorrow. <br />My best to your husband and your mom. <br />-Meg <br />From: Ruth Gonzales [mailto:gdp@gte.net] <br />Sent: Wednesday, May 06, 2009 3:03 PM <br />To: Meg Haley <br />Subject: RE: Second floor structural calculations required for permit 80901-019 for TI - NEW SECOND FLOOR <br />OFFICES at 830 SE EVEREfT MALL WAY <br />5/ 1 I /2009 <br />