Laserfiche WebLink
Second floor structural calcul/ations requircd for permit 80901-019 for T1 - NGW SGCON... Page 3 of 4 <br />V ' <br />To: gdp@gte.net <br />Cc: Steve Miller; Harvest Christian Center Int'I <br />Subject: RE: Second floor structural calculations required for permit 80901-019 for TI - NEW <br />SECOND FLOOR OFFICES at 830 SE EVERETT MALL WAY <br />Hi Ruth, <br />I am at a meeting most of today, Monday, but you can drop the information off at the front desk for <br />me. Please separate the beam calcuiati�� for the sanctuary from the information for the second <br />floor o�ces, so we can hopefully release the sanctuary permit. Steve and I will meet with Pastor <br />Kulakevi:h on Tuesday afternoon at the site to discuss and review the issues remaining on the <br />second floor. <br />I wish you and your husband the best. <br />—Meg <br />From: Ruth Gonzales [mailto:gdp@gte.net] <br />Sent: Friday, May Ol, 2009 3:10 PM <br />To: Meg Haley <br />Subject: RE: Second floor structural calculations required for permit B0901-019 for TI - NEW <br />SECOND FLOOR OFFICES 3t 830 SE EVERETT MALL WAY <br />Hi Meg, <br />Nick is getting the information together and will fax to me to include with the fire rating and railing <br />detail. <br />I am not available Tuesday, I will be at the hospital all day with my husband. My intent is to bring in <br />the remaining information Monday. <br />Thanks Ruth <br />-----Original Message----- <br />From: Meg Haley [mailto:MHaley@ci.everett.wa.us] <br />Sent: Friday, May Ol, 2009 2:47 PM <br />To: Steve Miller; gdp@gte.net; Harvest Christian Center Int'I <br />Cc: Tony Lee <br />Subject: Second floor structurel calculations required for permit B0901-019 for TI - <br />NEW SECOND FLOOR OFFICES at 830 SE EVERETT MALL WAY <br />In searching lhe permit record for the structural ceiling, and for the current permit <br />submittal, wa have not received calcuiations for the live and dead load of the second <br />floor o�ces, and we have not received the rated Floor-ceiling assembly, all of which <br />should be taken into account in the design of the structural framing for the second floor <br />offices. <br />Attached is an example of a one hour floor ceiling assembly, with one layer plywood <br />on top, but 2 layers of 5l8 inch gypsum board below, type x generic, GA file FC5407. <br />In the field on Tuesday, it would be helpful to have a section of the floor ceiling <br />assembly opened up to examine lhe actual construction. <br />«1133_001.pdf» <br />Thank you for your help to resolve these issues. We will have completed our review of <br />the resubmitted drawings so ihat we can discuss status in the field when we meet. <br />—Meg <br />5/ I 1 /2009 <br />7 <br />� <br />