My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
HARVEST CHRISTIAN CENTER
>
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:08:17 PM
Creation date
10/7/2019 2:52:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Tenant Name
HARVEST CHRISTIAN CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Second floor structural calcul/ations requircd for permit 80901-019 for T1 - NGW SGCON... Page 3 of 4 <br />V ' <br />To: gdp@gte.net <br />Cc: Steve Miller; Harvest Christian Center Int'I <br />Subject: RE: Second floor structural calculations required for permit 80901-019 for TI - NEW <br />SECOND FLOOR OFFICES at 830 SE EVERETT MALL WAY <br />Hi Ruth, <br />I am at a meeting most of today, Monday, but you can drop the information off at the front desk for <br />me. Please separate the beam calcuiati�� for the sanctuary from the information for the second <br />floor o�ces, so we can hopefully release the sanctuary permit. Steve and I will meet with Pastor <br />Kulakevi:h on Tuesday afternoon at the site to discuss and review the issues remaining on the <br />second floor. <br />I wish you and your husband the best. <br />—Meg <br />From: Ruth Gonzales [mailto:gdp@gte.net] <br />Sent: Friday, May Ol, 2009 3:10 PM <br />To: Meg Haley <br />Subject: RE: Second floor structural calculations required for permit B0901-019 for TI - NEW <br />SECOND FLOOR OFFICES 3t 830 SE EVERETT MALL WAY <br />Hi Meg, <br />Nick is getting the information together and will fax to me to include with the fire rating and railing <br />detail. <br />I am not available Tuesday, I will be at the hospital all day with my husband. My intent is to bring in <br />the remaining information Monday. <br />Thanks Ruth <br />-----Original Message----- <br />From: Meg Haley [mailto:MHaley@ci.everett.wa.us] <br />Sent: Friday, May Ol, 2009 2:47 PM <br />To: Steve Miller; gdp@gte.net; Harvest Christian Center Int'I <br />Cc: Tony Lee <br />Subject: Second floor structurel calculations required for permit B0901-019 for TI - <br />NEW SECOND FLOOR OFFICES at 830 SE EVERETT MALL WAY <br />In searching lhe permit record for the structural ceiling, and for the current permit <br />submittal, wa have not received calcuiations for the live and dead load of the second <br />floor o�ces, and we have not received the rated Floor-ceiling assembly, all of which <br />should be taken into account in the design of the structural framing for the second floor <br />offices. <br />Attached is an example of a one hour floor ceiling assembly, with one layer plywood <br />on top, but 2 layers of 5l8 inch gypsum board below, type x generic, GA file FC5407. <br />In the field on Tuesday, it would be helpful to have a section of the floor ceiling <br />assembly opened up to examine lhe actual construction. <br />«1133_001.pdf» <br />Thank you for your help to resolve these issues. We will have completed our review of <br />the resubmitted drawings so ihat we can discuss status in the field when we meet. <br />—Meg <br />5/ I 1 /2009 <br />7 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.