Laserfiche WebLink
Meg Haley <br />From: Meg Haley <br />Sent: Thursday, June 04, 2009 9:49 AM <br />To: 'Harvest Christian Center InPI'; 'gdp@gte.neY <br />Cc: Tony Lee; Steve Miller <br />Subject: Resuit of site visits on 6l3 for permits 60801-047 (issued), B0901-018 (not issued) and <br />60901-019(notissued) <br />Dear Ruth and Pastor Kulakevich, <br />Her2 is tre summary of status of the three projects at this address. <br />LJ <br />Harvest Christian <br />Center 2008 ... <br />1. 2nd correction letter for inspections for 2nd floor framingplan: permit B0901-019 <br />A permit HAS been issued for this work. <br />Attached is the electronic copy of the letter that Tony, Steve and I delivered to the field 'yesterday morning in <br />regards to missing information on the 2ntl floor structural framing plan. The building inspector, Mike Huhta, will <br />meet with the Pastor at the site today for an inspection. <br />,t.'�. <br />0529_OOI.pdF <br />Since we are awaiting the toilet room and changing room design from the architect based on discussions in the <br />fieid yesterday, work on those areas should not proceed until a sketch has been received and processed for <br />insertion into the site set for this permit. Please clarify on that sketch how the floor will be constructed at the new <br />storage room (formerly the elevator pit). <br />2. Site correction for permit B0901-019 for Sound Booth and Staqe <br />It was agreed at the site that the details submitted by the engineer for the support of the second floor balcony are <br />acceptabie to the owner, and the permit will be issued within the week. <br />3. Site correction for permit 80901-019 for TI - NEW SECOND FLOOR OFFICES at 830 SE EVERETT MALL <br />A permit has not been issued for this work. These comments are in addition to the third corrections letter dated <br />hlay 15, 2009. <br />-Meg <br />Tony identified a code violation at the site with the exterior stairs to the second floor. Although the drawings <br />ir�dicate that the height of the stair is ten feet, the measured height after visual inspection is 14'-6", which requires <br />an intermediate landing per IBC section 1009.6. <br />• That landing needs to be the minimurn required width of the stair in length, 44 inches, per IBC section <br />1009.4. <br />• Landings are also required at the top and bottom of the stair, where the landing walking surface is not <br />steeper than 2 percent slope (1:48), per IBC section 1009.5.1. <br />• The comments on the correction letters regarding the requirements for handrail and guard are still <br />applicable. <br />Steve identified missing information from the second floor framing plan: <br />• The detail and location for the strap design for the new second floor framing to attach to the existing <br />framing is required iram the structural engineer. <br />�. c, � , _�_. __ ��. i . .,_, _. <br />