My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
HARVEST CHRISTIAN CENTER
>
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:08:17 PM
Creation date
10/7/2019 2:52:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Tenant Name
HARVEST CHRISTIAN CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meg Haley <br />From: Meg Haley <br />Sent: Thursday, June 04, 2009 9:49 AM <br />To: 'Harvest Christian Center InPI'; 'gdp@gte.neY <br />Cc: Tony Lee; Steve Miller <br />Subject: Resuit of site visits on 6l3 for permits 60801-047 (issued), B0901-018 (not issued) and <br />60901-019(notissued) <br />Dear Ruth and Pastor Kulakevich, <br />Her2 is tre summary of status of the three projects at this address. <br />LJ <br />Harvest Christian <br />Center 2008 ... <br />1. 2nd correction letter for inspections for 2nd floor framingplan: permit B0901-019 <br />A permit HAS been issued for this work. <br />Attached is the electronic copy of the letter that Tony, Steve and I delivered to the field 'yesterday morning in <br />regards to missing information on the 2ntl floor structural framing plan. The building inspector, Mike Huhta, will <br />meet with the Pastor at the site today for an inspection. <br />,t.'�. <br />0529_OOI.pdF <br />Since we are awaiting the toilet room and changing room design from the architect based on discussions in the <br />fieid yesterday, work on those areas should not proceed until a sketch has been received and processed for <br />insertion into the site set for this permit. Please clarify on that sketch how the floor will be constructed at the new <br />storage room (formerly the elevator pit). <br />2. Site correction for permit B0901-019 for Sound Booth and Staqe <br />It was agreed at the site that the details submitted by the engineer for the support of the second floor balcony are <br />acceptabie to the owner, and the permit will be issued within the week. <br />3. Site correction for permit 80901-019 for TI - NEW SECOND FLOOR OFFICES at 830 SE EVERETT MALL <br />A permit has not been issued for this work. These comments are in addition to the third corrections letter dated <br />hlay 15, 2009. <br />-Meg <br />Tony identified a code violation at the site with the exterior stairs to the second floor. Although the drawings <br />ir�dicate that the height of the stair is ten feet, the measured height after visual inspection is 14'-6", which requires <br />an intermediate landing per IBC section 1009.6. <br />• That landing needs to be the minimurn required width of the stair in length, 44 inches, per IBC section <br />1009.4. <br />• Landings are also required at the top and bottom of the stair, where the landing walking surface is not <br />steeper than 2 percent slope (1:48), per IBC section 1009.5.1. <br />• The comments on the correction letters regarding the requirements for handrail and guard are still <br />applicable. <br />Steve identified missing information from the second floor framing plan: <br />• The detail and location for the strap design for the new second floor framing to attach to the existing <br />framing is required iram the structural engineer. <br />�. c, � , _�_. __ ��. i . .,_, _. <br />
The URL can be used to link to this page
Your browser does not support the video tag.