Laserfiche WebLink
i <br />�{ <br />stamping a document, does not become fully responsible for its contents, but is responsible for the <br />supervision of the subject matter that is within the engineer's scope of competence contained on that <br />document. <br />5. The determination of use should be established by the architect per IBC Section SOR.I. Full wall <br />sections and partition sections to underside of structure, indicating proposed construction and assembly <br />ratings rcquired for occupancy separation, area separation or building construction should be submitted <br />for review, per the City of Everett Pcrmit Checklist. <br />G. Accessible means of accessible egress, ramps, stairs, landings and door swings should be detailed and <br />dimensioned on the drawings to ccmply with width and clearance requirements of IBC Sections 1004.9, <br />1005.1, ]005.2, 1009.1, 1009.4, 1014.2, and all other applicuble portions of the code. <br />Building envelope calculations are required for the office and storage areus, per Chapter 13 of the <br />WSEC and the R-values should be indicated on the drawings at ail conditions to meet the selected <br />option of WSEC Table 13-I. <br />ApplicaUle codes includc the 2006 Intemational Building Code (IBC), the 200G International Mechanical Code <br />(IMC), the 2006 Intemational Firc Code (IPC), the 2006 Washington State Energy Code (WSEC), the <br />Vdashington Statc Vcutilation and ]ndoor Air Quality Code (WSVIAQ) 2006, and the 2003 Accessible and <br />Usable Buildings and Facilities A117.1-2003 (ICGANSII. All codes re1'erenced, as adopted by the City of <br />Everett, should include current revisions by the State of Wnshington. These comments address building issues <br />only. Revisians or additions may be mquired by other departments (such as Utilities, Planning or Fire). <br />Upon suUmission of hvo complete sets of the revised drawings and calculations, your application will be given <br />priority and plan revicw will begin. All required submittals must be of sufficient detail and information to <br />ensure that the proposed structure will be constructed iu compliance with all adopted codes. You can reach me <br />directly to discuss this letter by e-mail at mha�(iilci.everett.wa.us or by pLone a1425-257-8813. <br />Plans <br />Cc: Assistpht Building Official 7'ony Lcc, COG <br />Pasjdr Pcter Kidakevich, I]arvest Christian Center Intcmational <br />l�VHolo�q'nuRBOcnI.UJ�P]JScP:�ocn.11all N'aYJuc <br />