My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
HARVEST CHRISTIAN CENTER
>
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:08:17 PM
Creation date
10/7/2019 2:52:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Tenant Name
HARVEST CHRISTIAN CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October G, 2008 <br />:NG/NEER/NG / �UBL/C 5E/u//CE5 .OEPARTA!_FNT <br />Ms. Ruth Gonzales <br />Gonzales Dcsign Partners <br />P.O. Box 97 <br />Arlington, Washington 98223 <br />Project: Daycare and meuanine offices <br />Job Address: 830 SE �verett Mall Way <br />Plan Review No: BO801-047 <br />Dcar Ms. Gonzalcs, <br />In response to your application for building construction pertnit, a permit cannot be is:aued until the following <br />issucs are resolved. Please provide a response Ietter for cach of thc following items ta identify a sheet and detail <br />numbcr to reference for the corcection listed. Por clarification, please "cloud" drawing revisions in response to <br />this lettcr. Two complete sets are requircd for permit submittal. <br />Building Permit Plan Revicw: <br />Regurding items 1 of'!he prerious let[er dater! Ju(y 9, 2008: <br />1. Thc new area added to thc existing mezzaninc should be calculated on the code analysis. The existing <br />building total squarc foot arca of first floor and mezzanine was 35, )71 square feet, per the ceRificatc of <br />occupancy datcd 1993. The new mezzanine area would increase thc overall squarc footage of the <br />building. If it is nut the intent to includc the mezzanine work at this time undr.r this permit, please do <br />not include it on thc drawings. <br />Regnrdrng ilern 3 ojdie prevro�cs letter: <br />2. ArchitecWrai sections indica:ing ceiling heights, tloor heights, dctails of construction, fire-resistance <br />rating, matcrials and sizcs arc requi��d for thc slage, in the sanctuary, for the ncw second floor <br />mczzaninc arca, for the sound Uootli, and for the elevator. If the stage, elevator, mczzanine or sound <br />booth are not included in tl�is submittal for building permit, please do not include them on the drawings. <br />Regm•ding item 6 aj0�e previous leller: <br />3. The occupancy calculations for daycare require specific ages and number of children for each daycarc <br />room. The occupancy ty��c educalional (G) only applies to daycare when each child-care room has an <br />exit door directly to the ou!s�de, per IBC 308.5.2, when therc are six or more children less than 2.5 years <br />of age, and the occupancy of the room for daycarc is ten or less. Please reference the specific detail and <br />shcct far this infomiation in your response letter. <br />4. If classroom 10G is for children that are in daycare, the maximum occupancy of the room is ten, and <br />each separate classroom will requirc an exit direcdy to the exterior, per I13C table ]015.1. <br />5. If classroom 11 l is for cliiidren that are in daycare, the maaimum occupancy of the room is ten, and <br />each separate classroom will require an exit directly to the exterior, per IBC table 1015.1. <br />CITY OF EVERETf • 3200 Cedar Street • Everett, WA 98201 •(425) 257-880C� • Fax (425) 257-8856 �� <br />S\NIIa1.���1brJ.U0Xn1.UD F10 Sc f..<an �Iill N'ay:nJ vcbminvl dnc <br />
The URL can be used to link to this page
Your browser does not support the video tag.