Laserfiche WebLink
I-farvest Christian Center; 830 SE Everer `Qall Way: B0801-047 � Page 1 of 2 <br />t <br />Meg Haley <br />From: Meg Haley <br />Sent: Wednesday, Octobar 08, 2008 3:Oo PM <br />To: 'gdp@gte.neY; tehnteng@ncplus.net; acherba@gmail.com; dodyssey@hotmail.com <br />Cc: Tony Lee; Steve Miller <br />Subject: RE: Harvest Christian Center; 830 SE Everett Mall Way: B0801-047 <br />Attachments: 0515_001. pdf <br />Ruth, <br />Thanks for your responses to the concerns listed. However, additional information is still required prior to issuing permits. <br />1. The elevator cab submitted in the drawings does not meet the requirements of the city ordinance for a 24 inch by 84 inch <br />stretcher-reference sheet A2.3. We are researching whether or not an administrative action can be written on this issue to allow <br />for a smaller elevator-see attaciied. Is the new area of the mezzanine less than 3000 square f�et? <br />2. The etevator and mezzanine would be required to be submitted under a separate "shell permiP' if the work is not going to be <br />completed. The accessory religious rooms in the northwest quadrant can then receive the certificate of occupancy as a"tenant <br />improvement', and the new mezzanine and elevator shouid be submitted separately. <br />3. We agree that the resolution of the use of the child care in the accessory religious rooms requires a letter from the owner. <br />4. The architectural details and design for the projection booth, stage, baptistery, mezzanine and elevator wili be required before a <br />permit can be issued for that work. Structurai details are required for the baptistery pool, new stage, new meuanine and new <br />elevator lo include: dMails of the structural support assembly, matcrial sizc, thickncss, dimensioning, and connections, per IBC <br />I G03. I . <br />If a meeting will not be the best way to resolve these issues, we can work directly with Alex Cherba to determine the scope and <br />valuation of what is submitted for permit. <br />Thanks, <br />Meg <br />From: Ruth Gonzales [mailto:gdp@gte.net] <br />Sent: Wednesday, Odober 08, 2008 2:38 PM <br />To: Meg Haley; lehnleng@ncplus.net; acherba@gmail.com; dodyssey@hotmail.com <br />Cc: Tony Lee; Steve Miller <br />Subjed: RE: Harvest Christian Center; 830 SE Ev:rett Mall Way: 60801-047 <br />1. The elevator was sized to accommodate the gurney dimensions. The elevation structure needs to be installed under this phase <br />in anticipation of the future mezzanine phase. The floor I ceiling framing for the mezzanine will be in:>talled under this phase to <br />provide the ceiling system for the main flocr but the upper level shall not be complet�,� at this time. <br />2. Alex shall deliver wet stamped structural drawings. <br />3.The nursery is not a daycare as defined by 2006 IRC 305.1, 305.2 and Section 506.3.1. The Nursf:ry area is for parents with <br />children who need to take a break from services. It shall be used only as a support to church functions and gives parents a place <br />to take their child for changing, nursing, etc. The primary use shall be for babies and toddlers under the age of 30 montfis. <br />Occupancy and use shall be less than 5 over the age of 30 months. The nursery area is less than 10% of the main Assembly A-3 <br />use and less than 100 occupants. A letter from the church shall be provided to confirm the use as noted above. <br />4. This projects phase shall include the main floor class rooms in the northwest quadrant of the structure, shaft and support <br />structure for the elevator (no elevator equipment), the sound booth, and stage. The upper floorlceiling system shall be framed to <br />provide the enclosure of the main floor classrooms, the upper floor mezzanine shall be completed urider a separate permit. <br />Sincerely, <br />Ruth Gonzales <br />Architect <br />� oixr_oox <br />