My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
HARVEST CHRISTIAN CENTER
>
830 SE EVERETT MALL WAY HARVEST CHRISTIAN CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:08:17 PM
Creation date
10/7/2019 2:52:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Tenant Name
HARVEST CHRISTIAN CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />Meg Haley <br />From: Meg Haley <br />Sent: Tuesday, October 07, 2008 4:30 PM <br />To: 'dodyssey@hotmail.com' <br />Cc: 'gdp@gte.neP; 'acherba@gmail.com'; Tony Lee; Rick Robinson <br />Subject: RE: Status of review of Harvest Christian Center B0801-047 <br />Atta c h m e n ts: 0 046_0 01. p d f <br />Ruth and Alex, <br />There are two main issues in this e-mail and Ruth's response letter that we need to clarify. <br />• The first issue is phasing and permits. I would be glad to meet with you to resolve the remaining issues to get a permit <br />for the work that you would like to inciude in this phase. If you are planning on two phases, where the mezzanine and <br />elevator are being constructed during a time of year when the daycare would not be in use, ihen separate permits are <br />recommended. That way you can obtain a certificate of occupancy for the daycare services, and then phase another <br />permit for the construction of the mezzanine and the elevator at a time when you could close down the daycare. For <br />reference, att:3ched is the daycare checklist and Ruth's response letter, which I would like to discuss with you to make <br />sure I understand what is referenced on the letter. <br />� <br />0046_OOl.pdf(554 <br />KB) <br />• The second issue is the elevator. In researching the elevator requirements, we may have to revisit the conv=rsation <br />we had last week regarding eievator size, based on the following City of Evereti ordinance. <br />V. Scction 3002.4 of thc 2006 Gdition ot the II3C is amended as follows: <br />Where elevators are provided in buildings, at least one elevator shall be provided for fire depariment <br />emergency �ccess to all Iloors. The cicvator c�r shall be of such a size and arcangement to accommodate <br />a 24-inch by 84-inch (610 mm by 19311 mm) ambulance stretcher in the horizontal, open position and <br />shall be identified by tl�e international symbol for emergency medical services (star of life). The symbol <br />shall not be less than 3 inches (7G mm) high and shall be placed inside on both sides of the hoistway <br />door frame. <br />Exception: If all stories within tlie building have direct, accessible egress to grade. <br />Please le! me know what is most convenient for you. I can arrange a meeting to suit your schedule. <br />'Meg <br />Meg Haley � Plans Etiaminer, NCARB <br />Engineering/Public Scrvices � 3200 Cedar Street, Semnd Floor � Everett, \NA 9&201 <br />P: 425.258.8813 � F: 425.Z57.8856 � E: mha �ci.evere_tt.wa.us � W: htto•//www ci everett �va u�/default asox�ID=1170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.