Laserfiche WebLink
� <br />2. Completed <br />l <br />3. Completed <br />4. 1"ha existing occupancy siyn s�iall be verified and modified to refleet the maxirr�um <br />acrupancy of 356. <br />5. Completed <br />6. Ramp shall be constructed at a 1/12 max. slope and shall land at platform elevation +21" <br />AFF. The landing area shall be 5'-0" in depth and equal width to the ram�p. See revised floor <br />plan for reconfiguration of ramp to accommodate required slope. <br />7. See revised plans indicating platform elevation of +21" which also includes previously added <br />handrails at stair� to �+lafform. <br />8. Completed <br />9. Completed <br />Accessibility: <br />1. Completed. <br />2. Completed <br />Two sets of revised documents have been provided with this letter for re-submittal along with an <br />additional copy of the plans with max. occupancy numbers noted. Please call 360-435-5514 or <br />email me at GDP(a�GTE.NET if you have any questions. Thank you for your time and <br />consideration regarding lhis project. <br />Sincerely, <br />Ruth E. Gonzales, Architect <br />Gonzales Design Partners <br />P.O. Box 97 <br />Arlington, Washingtcn 98223 <br />