Laserfiche WebLink
' , Darden Restaurants, Inc. September 15,2011 <br /> Proposed Olive Garden—Everett,Washington Page 8 of 12 <br /> damage should some settlement of the supporting subgrade take place. <br /> ■ Cracking of slabs-on-grade is normal and should be expected. Cracking can occur not <br /> only because of heaving or compression of the supporting soil, but also because of <br /> concrete curing stresses. The occurrence of concrete shrinkage cracks, and problems <br /> associated with concrete curing may be reduced and/or controlled by limiting the <br /> water/cement ratio of the concrete, proper concrete placement, finishing, and curing, and <br /> by the placement of crack control joints at frequent intervals, particularly, where re-entrant <br /> slab corners occur. The American Concrete Institute (ACI) recommends a maximum <br /> panel size (in feet) equal to approximately three times the thickness of the slab (in inches) <br /> in both directions. For example, joints are recommended at a maximum spacing of 12 <br /> feet, assuming a four-inch thick slab. We recommend also that control joints be scored <br /> three feet in from, and parallel to, the foundation walls. Using fiber reinforcement in the <br /> concrete can also control shrinkage cracking. <br /> ■ Some increase in moisture content is inevitable because of development and associated <br /> landscaping. However, extreme moisture content increases can be largely controlled by <br /> proper and responsible site drainage, building maintenance and irrigation practices. <br /> ■ Backfill in areas supporting slabs should be moisture conditioned or dried by scarification <br /> and compacted. Backfill in all interior and exterior water and sewer line trenches should <br /> be carefully compacted. <br /> ■ Exterior slabs should be isolated from the building. These slabs should be reinforced to <br /> function as independent units. Movement of these slabs should not be transmitted to the <br /> building foundation or superstructure. <br /> 3.7 Drainaqe Considerations <br /> Water should not be allowed to collect in the foundation excavation, on the floor slab areas, or on <br /> prepared subgrade of the construction area either during or after construction. PSI recommends <br /> that footing drains be placed around the exterior of the building foundation to reduce the potential <br /> for migration of moisture into the building envelope. PSI recommends that roof drains be <br /> connected to a tightline leading to storm drain facilities. Pavement surfaces and open space <br /> areas should be sloped such that surface water runoff is collected and routed to suitable <br /> discharge points. We also recommend that ground surfaces adjacent to buildings be sloped to <br /> facilitate positive drainage away from the building. <br /> 3.8 Earthquake and Seismic Desiqn Considerations <br /> The project site is located within a municipality that employs the International Building Code, 2009 <br /> edition. As part of this code, the design of structures must consider dynamic forces resulting from <br /> seismic events. These forces are dependent upon the magnitude of the earthquake event as well <br /> as the properties of the soils that underlie the site. As part of the procedure to evaluate seismic <br /> forces, the code requires the evaluation of the Seismic Site Class, which categorizes the site <br /> based upon the characteristics of the subsurface profile within the upper 100 feet of the ground <br /> surface. To define the Site Class for this project, we have interpreted the results of soil test <br /> borings drilled within the project site and estimated appropriate soil properties below the base of <br />