Laserfiche WebLink
ROEN ASSOCIATES—ESTIMATING <br /> PART 1 <br /> Master Plan Update—Public Works Campus <br /> A. Kick off meeting <br /> B. Update of Master Plan estimates <br /> C. In house review <br /> D. Estimate presentation meeting <br /> E. Final Revisions <br /> Deliverables <br /> A. Draft estimate for up to three (3) conceptual Master Plan options <br /> B. Attend draft cost review meeting <br /> C. Development of cost model for final Master Plan <br /> D. Final estimate for Master Plan report <br /> PART 2 <br /> Master Plan Update—Transit Operations Site <br /> A. Kick off meeting <br /> B. Update of Master Plan estimates <br /> C. In house review <br /> D. Estimate presentation meeting <br /> E. Final Revisions <br /> Deliverables <br /> A. Draft estimate for up to three (3) conceptual Master Plan options <br /> B. Attend draft cost review meeting <br /> C. Development of cost model for final Master Plan <br /> D. Final estimate for Master Plan report <br /> SCOPE OF WORK-SCHEDULE <br /> A. All deliverables shall be completed no later than June 30, 2016 <br /> B. The contract shall include a design contingency. <br /> C. The contract completion date shall be August 31, 2016 <br /> Page 4 of 4 <br />