Laserfiche WebLink
EXHIBIT B <br /> COMPENSATION <br /> LUMP SUM <br /> The City shall pay Service Provider Two Hundred and Forty Thousand dollars($240,000.00) upon <br /> completion of the Work, subject to the maximum stated in ¶4(D) of this Agreement. <br /> A breakdown of the compensation is as follows: <br /> MASTER PLAN DESIGN SERVICES—BASE FEE <br /> Pinnacle Consulting Group, Inc. (Industrial Planning) $ 24,600 <br /> David Evans Associates (Civil, Landscape,Traffic Analysis) $ 20,420 <br /> Roen Associates (Cost Estimating) $ 9,500 <br /> DLR Group—Base Fee $150,000 <br /> DLR Group—Consultants Markup $ 5,480 <br /> Indirect Cost (5%-Total Base Fee) $ 10,000 <br /> TOTAL MASTER PLAN DESIGN SERVICES- BASE FEE $220,000 <br /> DESIGN CONTINGENCY FEE(IF REQUIRED) <br /> Additional Services that may be needed based upon any issues that surface during the development of <br /> the Master Plan as approved only in writing and signed by an authorized City representative. <br /> TOTAL DESIGN CONTINGENCY FEE $ 20,000 <br /> LUMP SUM COMPENSATION <br /> MASTER PLAN DESIGN SERVICES- BASE FEE $220,000 <br /> DESIGN CONTIGENCY FEE $ 20,000 <br /> TOTAL LUMP SUM COMPENSATION $240,000 <br /> MASTER PLAN DESIGN SERVICES—BILLING PERCENTAGE <br /> For billing purposes the BASE FEE shall be divided as follows: <br /> BASE FEEE $220,000 <br /> TRANSIT MASTER PLAN—(30%) $ 66,000 <br /> PUBLIC WORKS MASTER PLAN—(70%) $154,000 <br /> The DESIGN CONTINGENCY FEE shall be assigned to either the Transit Master Plan or the Public Works <br /> Master Plan if required. <br /> Page 1 of 1 <br />