My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stantec Consulting Services Inc
>
Contracts
>
6 Years Then Destroy
>
2020
>
Stantec Consulting Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2019 9:16:31 AM
Creation date
10/17/2019 9:15:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stantec Consulting Services Inc
Approval Date
9/20/2019
Council Approval Date
9/11/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
2020 Water Pollution Control Facility Plan
Total Compensation
$579,090.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> August 6,2019 <br /> Page 14 of 14 <br /> • Existing documents (reports,studies,drawings,etc.)will be provided to Stantec in pdf format. <br /> Data provided by the City will be provided in Excel format. <br /> • Stantec shall be entitled to reasonably rely upon the information and data provided by the City <br /> or obtained from generally acceptable sources within the industry without independent <br /> verification except to the extent such verification is expressly included in the Scope of Services. <br /> • In case of any scope change,Stantec will make the City aware of the change and its impact on <br /> budget and schedule and shall not start any work without the City's approval. <br /> • The City will cooperate with Stantec for any coordination to get the required data from the <br /> respective agencies and organizations. <br /> • Workshops identified in Exhibit A will be held at the WPCF and will include the Project Manager <br /> and Project Engineer attending in person. Other required team members may join the workshop <br /> in person or via Skype. <br /> • Level of detail included in the Facility Plan will be similar to that included in the 2010 Water <br /> Pollution Control Facility Engineering Report(revised,April 2010, Carollo). <br />
The URL can be used to link to this page
Your browser does not support the video tag.