My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stantec Consulting Services Inc
>
Contracts
>
6 Years Then Destroy
>
2020
>
Stantec Consulting Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2019 9:16:31 AM
Creation date
10/17/2019 9:15:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stantec Consulting Services Inc
Approval Date
9/20/2019
Council Approval Date
9/11/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
2020 Water Pollution Control Facility Plan
Total Compensation
$579,090.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Stantec <br /> August 6,2019 <br /> Page 13 of 14 <br /> • Monthly invoice and status report <br /> • Quality Management Plan <br /> Task 1000 Allowance for Unspecified Services <br /> This task includes a budget allowance for services outside the scope defined in Tasks 100-900 that may <br /> arise over the course of the project. Use of funds in Task 1000 will be at the City's discretion and must <br /> be approved in writing by the City's Project Manager prior to initiating the Stantec team efforts. <br /> Key Assumptions <br /> The followings are key assumptions that apply to this project. <br /> • Project award will be at the end of August 2019 and the final Facility Plan will be submitted by <br /> December 2020(16 months). <br /> • Stantec will provide draft agendas prior to every meeting or workshop with City staff and will <br /> prepare minutes for City review. <br /> • Kickoff meeting and the first site visit will be on the same day. Five Stantec team members will <br /> attend the Kickoff Meeting and site visit. If kickoff meeting and site visit are held on different <br /> days,several team members may attend the kickoff meeting via Skype. <br /> • All documents and drawings will be delivered electronically in PDF format.The Final Draft and <br /> Final Facility Plan will be transmitted electronically in PDF format together with two signed and <br /> stamped sets of hard copies which will be mailed to the City. <br /> • All draft documents (reports and drawings)will be submitted for one round of review and <br /> comment prior to finalization.The city will have 10 business days to review and comment. <br /> • City will provide daily influent flows and wastewater concentrations,effluent flows and <br /> wastewater concentrations, and available process and operational data in spreadsheet format. <br /> • City will provide land use and zoning information for service area, including City of Everett and <br /> any other contributing districts.Service area boundaries,zoning, and land use mapping will be <br /> provided in GIS format. <br /> • Condition Assessment of tanks that are in service at the time of condition inspection,including <br /> lagoon/pond liners,will be based on available data and information from City staff. No separate <br /> inspection will be provided. <br /> • Seismic resiliency analysis will be based on current code requirements for existing buildings as <br /> described in ASCE 41 as Basic Performance Objectives for Existing Buildings,ASCE 41;assessing <br /> the ability of facilities to perform at a higher level of service is not included in the scope of work. <br /> • No bench or pilot testing is included in the scope of work. <br /> • City will be responsible for all efforts associated with sample collection and analysis based on <br /> the Sampling and Analysis Plan prepared in Subtask 400.001. Data will be provided to Stantec in <br /> Excel format. <br />
The URL can be used to link to this page
Your browser does not support the video tag.