Laserfiche WebLink
• (27)Navigation Software License <br /> • (27)XGate per Unit License <br /> • (27)XMobileManager per Unit License <br /> • (1)Ranger4 USB Programming Kit <br /> • (1)Ranger Training Kit <br /> Equipment Deliverables—Spare Units <br /> • (2)Ranger4 MDTs(Internal modem,GPS,Wi-Fi) <br /> • (2)Ranger4 Mounting Brackets <br /> • (2)Ranger4 Cabling <br /> Additional Documentation Deliverables <br /> • System Overview <br /> • Ranger4 Vehicle Installation Guide <br /> • Ranger4 Maintenance and Troubleshooting Guide <br /> • Ongoing Support Procedures <br /> • Warranty Repair Policies <br /> • Cabling Specifications <br /> • Operator/Driver Manual for Ranger4 <br /> Timeframe <br /> This implementation can be completed within approx.five(5)months from delivery of the Equipment at Customer. <br /> During the operational review,a project plan will be prepared for each Software module. <br /> Note:The delivery time for the Equipment is provided at the time of ordering. Currently,the lead time for the <br /> delivery of Equipment is twelve(12)weeks. <br /> TripSpark Implementation Services <br /> The implementation Services below will be provided by TripSpark. All implementation Services,materials and <br /> training will be provided in English,unless otherwise stated. <br /> Travel expenses have been quoted based on a minimum of 2 weeks' notice for travel dates.Insufficient travel notice <br /> will result in additional travel expenses being incurred by Customer to cover the higher cost of last minute travel. <br /> Project Design <br /> Project design will involve a series of meetings and conference calls with Customer's project team to discuss the <br /> following items: <br /> • Existing infrastructure(back office,network,cellular,etc.) <br /> • Current operational environment(policies/procedures)as they relate to the dispatch/driver process. <br /> • Software configuration. <br /> • Testing and Training requirements. <br /> City of Everett <br /> Contract Amendment#5 <br />