My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 1 factor into the canopy cover. Growth and establishment may require <br /> q <br /> 2 supplemental irrigation to meet cover requirements. <br /> 13 <br /> 4 2. Stand health is evident by vigorously growing planted species having a <br /> 5 uniform rich-green appearance and with no dead patches or major gaps <br /> I 6 of growth. A stand of grass that displays rusting, wilting, stunted growth, <br /> 7 disease, yellowing or browning of leaves, or bare patches does not meet <br /> 8 the stand health requirement. <br /> 9 <br /> I10 3. The Contractor shall establish a stable stand of grass free of all weeds, <br /> 11 non-specified grasses, and other undesirable vegetation. Weed control <br /> 12 shall be in accordance with the Weed and Pest Control Plan and occur <br /> I 13 on a monthly basis during the establishment period and through the life <br /> 14 of the Contract. <br /> 15 <br /> I 16 4. Remove all trash, rocks, construction debris, and other obstructions that <br /> 17 may be detrimental to the continued establishment of future seeding. <br /> 18 <br /> 19 In addition to the requirements of Section 1-07.13(1), restoration of eroded areas <br /> I20 including clean up, removal, and proper disposal of eroded material, filling and <br /> 21 raking of eroded areas with Topsoil Type A or fine compost, and re-application of <br /> 22 the specified seed, fertilizer, and mulch shall occur at no additional cost to the <br /> I 23 Contracting Agency. <br /> 24 <br /> 25 8-02.3(10) Lawn Installation <br /> I 26 8-02.3(10)A Dates and Conditions for Lawn Installation <br /> 27 In irrigated areas, lawn installation shall not begin until the irrigation system <br /> 28 is fully operational. <br /> 29 <br /> 30 Unless otherwise allowed by the Engineer, seeded lawn installation shall be <br /> 31 performed during the following time periods at the location shown: <br /> 32 <br /> I Western Washington Eastern Washington <br /> (West of the Cascade Mountain (East of the Cascade Mountain <br /> Crest) Crest) <br /> I March 1 through May 15 October 1 through November 15 <br /> September 1 through October 1 <br /> When irrigation system is operational When irrigation system is operational <br /> I March 1 through October 1 March 1 through November 1 <br /> 33 <br /> 34 8-02.3(10)B Lawn Seeding and Sodding <br /> 35 The Contractor shall prepare the lawn area in accordance with Section 8-02.3(5) <br /> I 36 and apply seed at the mix and rate of application as specified in the Special <br /> 37 Provisions. <br /> 38 <br /> I 39 The Contractor shall have the option of sodding in lieu of seeding for lawn <br /> 40 installation at no additional expense to the Contracting Agency. Seeding in lieu of <br /> 41 sodding will not be allowed. <br /> 42 <br /> I43 Seed placed by hand shall be raked into the soil. Following raking, the seeded soil <br /> 44 shall be rolled with a smooth 50-pound roller. Sod strips shall be placed within 48 <br /> I City of EverettPage AM 97 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.