Laserfiche WebLink
I <br /> 1 control methods according to Section 8-01 shall be used to protect the bare soil <br /> 2 until seeding conditions improve. <br /> 3 <br /> 4 8-02.3(9)B Seeding and Fertilizing <br /> 5 The Contractor shall prepare the seeding area in accordance with Section 8- <br /> 6 02.3(5)A and apply seed at the rate and mix specified in the Special Provisions. <br /> 7 The Contractor shall notify the Engineer within 5 days in advance of any seeding <br /> 8 operation and shall not begin the Work until areas prepared or designated for <br /> 9 seeding have been accepted. Following the Engineer's acceptance, seeding of <br /> 10 the accepted ground surfaces shall begin immediately. <br /> 11 <br /> 12 Seeding shall not be done during windy weather or when the ground is frozen, or <br /> 13 excessively wet. <br /> 14 <br /> 15 When seeding by hand, the seed shall be incorporated into the top 1/4 inch of soil <br /> 16 by hand raking or other method that is allowed by the Engineer. <br /> 17 <br /> 18 Seed applied as a separate operation using a hydroseeder shall have a tracer <br /> 19 added to visibly aid uniform application. The tracer shall be HECP Short-Term <br /> 20 Mulch applied at a rate of 200 to 250 pounds per acre and the tracer shall carry <br /> 21 the measured specified seeding rate. <br /> 22 <br /> 23 8-02.3(9)C Seeding with Fertilizers and Mulches <br /> 24 When the Proposal includes any variation of seeding, fertilizing, and without <br /> 25 mulching, the seed and fertilizer shall be applied in one application followed by <br /> 26 mulching. West of the Cascade Mountains, seed, fertilizer, and mulch may be <br /> 27 completely applied in one application. East of the Cascades, seeding, fertilizing, <br /> 28 and mulching shall not be applied as a single application unless allowed by the <br /> 29 Engineer in writing prior to application. The fertilizing and mulching shall meet the <br /> 30 requirements of Sections 8-02.3(6) and 8-02.3(11). <br /> 31 <br /> 32 8-02.3(9)D Inspection <br /> 33 Seeded areas will be inspected upon completion of seeding, fertilizing, and <br /> 34 mulching. The Work in any area will not be measured for payment until a uniform <br /> 35 distribution of the materials is accomplished at the specified rate. Areas that have <br /> 36 not received a uniform application of seed, fertilizer, and mulch at the specified <br /> 37 rate, as determined by the Engineer, shall be re-seeded, re-fertilized, or re- <br /> 38 mulched prior to payment for seeding within a designated area. <br /> 39 <br /> 40 8-02.3(9)E Protection and Care of Seeded Areas <br /> 41 The Contractor shall install and establish a stable and weed free stand of grass as <br /> 42 specified within all designated permanent seeding areas. A stable stand of grass <br /> 43 shall meet the following requirements: <br /> III <br /> 44 <br /> 45 1. A dense and uniform canopy cover, 70% for Western Washington and <br /> 46 50% for Eastern Washington, of specified species covers all seeded <br /> 47 areas after 3 months of active growth following germination during the <br /> 48 growing season. Canopy cover is defined as the cover of living and <br /> 49 vigorous grass blades, leaves, and shoots of specified species. Volunteer <br /> 50 species, weeds, woody plants, or other undesirable vegetation shall not I <br /> City of Everett Page AM-96 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />