Laserfiche WebLink
I <br /> 1 Within 48 hours of application, the Moderate-Term Mulch shall bond with the soil surface to <br /> 2 create a continuous, absorbent, flexible, erosion-resistant blanket. Moderate-Term Mulch <br /> I 3 shall effectively perform the intended erosion control function in accordance with Section 8- <br /> 4 01.3(1) for a minimum of 3 months, or until temporary vegetation has been established, <br /> 5 whichever comes first. <br /> I 6 <br /> 7 Moderate-Term Mulch shall not be used in conjunction with permanent seeding. <br /> 8 <br /> 9 9-14.4(2)C Short-Term Mulch <br /> I10 This section is revised to read: <br /> 11 <br /> 12 Short-Term Mulch shall effectively perform the intended erosion control function in <br /> 13 accordance with Section 8-01.3(1) for a minimum of 2 months, or until temporary vegetation <br /> 14 has been established, whichever comes first. Short-Term Mulch shall not be used in <br /> 15 conjunction with permanent seeding. <br /> I 16 <br /> 17 Section 9-16, Fence and Guardrail <br /> 18 August 6, 2018 <br /> 111 19 9-16.3(1) Rail Element <br /> 20 The last sentence of the first paragraph is revised to read: <br /> 21 <br /> 111 22 All rail elements shall be formed from 12 gage steel except for thrie beam reducer sections, <br /> 23 reduced length thrie beam rail elements, thrie beams used for bridge rail retrofits, and <br /> 24 Design F end sections, which shall be formed from 10-gage steel. <br /> I 25 <br /> 26 9-16.3(5) Anchors <br /> 27 The last paragraph is revised to read: <br /> I 28 <br /> 29 Cement grout shall conform to Section 9-20.3(4) and consist of one part portland cement or <br /> 30 blended hydraulic cement and two parts sand. <br /> 31 <br /> I32 Section 9-18, Precast Traffic Curb <br /> 33 April 2, 2018 <br /> I 34 9-18.1(1) Aggregates and Proportioning <br /> 35 Item number 1 of the first paragraph is revised to read: <br /> 36 <br /> I 37 1. Portland cement or blended hydraulic cement shall conform to the requirements of <br /> 38 Section 9-01 except that it may be Type I portland cement conforming to AASHTO M <br /> 39 85. <br /> I 40 <br /> 41 Section 9-20, Concrete Patching Material, Grout, and Mortar <br /> 42 April 1, 2019 <br /> 1 43 9-20.1 Patching Material <br /> 44 This section, including title, is revised to read: <br /> 45 <br /> 1 <br /> I City of EverettPage AM-129 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />