My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 pattern or semi-open concrete masonry units placed upon the slope closely adjoining each <br /> 2 other. <br /> 3 <br /> 4 9-13.5(2) Poured Portland Cement Concrete Slope Protection <br /> 5 This section's title is revised to read: <br /> 6 <br /> 7 Poured Portland Cement or Blended Hydraulic Cement Concrete Slope <br /> 8 Protection <br /> 9 <br /> 10 9-13.5(3) Pneumatically Placed Portland Cement Concrete Slope Protection <br /> 11 This section's title is revised to read: <br /> 12 <br /> 13 Pneumatically Placed Portland Cement or Blended Hydraulic Cement <br /> 14 Concrete Slope Protection <br /> 15 <br /> 16 The first paragraph is revised to read: <br /> 17 <br /> 18 Cement—This material shall be portland cement or blended hydraulic cement as specified <br /> 19 in Section 9-01. <br /> 20 <br /> 21 9-13.7(1) Rock for Rock Walls and Chinking Material <br /> 22 The first paragraph (up until the colon) is revised to read: <br /> 23 <br /> 24 Rock for rock walls and chinking material shall be hard, sound and durable material, <br /> 25 free from seams, cracks, and other defects tending to destroy its resistance to weather, <br /> 26 and shall meet the following test requirements: <br /> 27 <br /> 28 Section 9-14, Erosion Control and Roadside Planting <br /> 29 August 6, 2018 1 <br /> 30 9-14.4(2) Hydraulically Applied Erosion Control Products (HECPs) <br /> 31 In Table 1, the last four rows are deleted. <br /> 32 <br /> 33 9-14.4(2)A Long-Term Mulch <br /> 34 The first paragraph is supplemented with the following: <br /> 35 <br /> 36 Products containing cellulose fiber produced from paper or paper components will not be <br /> 37 accepted. <br /> 38 I 39 Table 2 is supplemented with the following new rows: <br /> 40 <br /> Water Holding Capacity ASTM D 7367 800 percent minimum <br /> Organic Matter Content AASHTO T 267 90 percent minimum <br /> Seed Germination ASTM D 7322 Long Term <br /> Enhancement 420 percent minimum <br /> 41 <br /> 42 <br /> 43 9-14.4(2)B Moderate-Term Mulch <br /> 44 This section is revised to read: <br /> 45 <br /> City of Everett Page AM-128 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.