My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 Section 9-23, Concrete Curing Materials and Admixtures <br /> 2 April 1, 2019 <br /> I3 9-23.12 Natural Pozzolan <br /> 4 This section is revised to read: <br /> I 5 <br /> 6 Natural Pozzolans shall be ground Pumice and shall conform to the requirements of <br /> 7 AASHTO M295 Class N, including supplementary optional chemical requirements as set <br /> 1 8 forth in Table 2. <br /> 9 <br /> 10 9-23.13 Blended Supplementary Cementitious Material <br /> 1 The second sentence is revised to read: <br /> Ii <br /> 12 <br /> 13 Blended SCMs shall be limited to binary or ternary blends of fly ash, ground granulated <br /> 14 blast furnace slag and microsilica fume. <br /> I 15 <br /> 16 The second to last sentence is deleted. <br /> 17 <br /> I 18 Section 9-26, Epoxy Resins <br /> 19 January 7, 2019 <br /> I 20 9-26.1(1) General <br /> 21 The following new sentence is inserted after the first sentence of the first paragraph: <br /> 22 <br /> 23 For pre-packaged cartridge kits, the epoxy bonding agent shall meet the requirements of <br /> I <br /> 24 ASTM C881 when mixed according to manufacturer instructions, utilizing the <br /> 25 manufacturer's mixing nozzle. <br /> 26 <br /> I 27 9-26.1(2) Packaging and Marking <br /> 28 The first sentence of the first paragraph is revised to read: <br /> 29 <br /> I 30 The components of the epoxy system furnished under these Specifications shall be <br /> 31 supplied in separate containers or pre-packaged cartridge kits that are non-reactive with the <br /> 32 materials contained. <br /> 33 <br /> 34 The second paragraph is revised to read: <br /> 35 <br /> 36 Separate containers shall be marked by permanent marking that identify the formulator, <br /> I 37 "Component A" (contains the Epoxy Resin) and "Component B" (Contains the Curing <br /> 38 Agent), type, grade, class, lot or batch number, mixing instructions and the quantity <br /> 39 contained in pounds or gallons as defined by these Specifications. <br /> I 40 <br /> 41 The following new paragraph is inserted after the second paragraph: <br /> 42 <br /> 43 Pre-packaged cartridge kits shall be marked by permanent marking that identify the <br /> 1 <br /> 44 formulator, type, grade, class, lot or batch number, mixing instructions and the quantity <br /> 45 contained in ounces or milliliters as defined by these Specifications. <br /> 46 <br /> I City of EverettPage AM-133 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.