Laserfiche WebLink
I <br /> ITest Deck Durability6 ASTM D913 >_70%paint retention in <br /> wheel track' <br /> I Mud Cracking (See note 7) No Cracks No Cracks <br /> 1 <br /> 2 After the preceding Amendments are applied, the following new column is inserted after the <br /> I 3 "Standard Waterborne Paint Type 1 and 2" column: <br /> 4 <br /> Semi-Durable Waterborne Paint Type 3 <br /> White Yellow <br /> I Min. Max. Min. Max. <br /> Within±0.3 of qualification sample <br /> I80 95 80 95 <br /> 60 60 <br /> 77 77 <br /> I <br /> 43 65 <br /> 43 65 <br /> 1.25 1.25 <br /> 3 3 <br /> I 0.98 0.96 <br /> 88 50 <br /> 100° 100° <br /> I <br /> 9.5 9.5 <br /> 10 10 <br /> 100%acrylic emulsion <br /> @ 5 cycles show no coagulation or <br /> I <br /> change in viscosity greater than±10 KU <br /> ±10 KU from the initial viscosity <br /> No Cracks <br /> I Pass at 0.25 in mandrel <br /> __70%paint retention in wheel track <br /> No Cracks <br /> 5 <br /> I 6 The footnotes are supplemented with the following: <br /> 7 <br /> 8 4Cross-linking acrylic shall meet the requirements of federal specification TT-P-1952F <br /> I 9 Section 3.1.1. <br /> 10 <br /> 11 5Cold Flexibility: The paint shall be applied to an aluminum panel at a wet film thickness of <br /> I 12 15 mils and allowed to dry under ambient conditions (50±10% RH and 72±5 °F) for 24 <br /> 13 hours. A cylindrical mandrel apparatus (in accordance with ASTM D522 method B) shall be <br /> 14 put in a 40°F refrigerator when the paint is drawn down. After 24 hours, the aluminum <br /> I15 panel with dry paint shall be put in the 40°F refrigerator with the mandrel apparatus for 2 <br /> 16 hours. After 2 hours, the panel and test apparatus shall be removed and immediately tested <br /> 17 to according to ASTM D522 to evaluate cold flexibility. Paint must show no evidence of <br /> 18 cracking, chipping or flaking when bent 180 degrees over a mandrel bar of specified <br /> I 19 <br /> 20 diameter. <br /> 21 6NTPEP test deck, or a test deck conforming to ASTM D713, shall be conducted for a <br /> 1 22 minimum of six months with the following additional requirements: it shall be applied at 15 <br /> I City of EverettPage AM-143 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />