Laserfiche WebLink
I <br /> I1 4-04 BALLAST AND CRUSHED SURFACING 1 <br /> 2 4-04.1 Description 1 <br /> I <br /> 3 Division 5 - Surface Treatments and Pavements 1 <br /> 4 5-04 HOT MIX ASPHALT 1 <br /> I 5 5-04.1 Description 1 <br /> 6 5-04.2 Materials 1 <br /> 7 5-04.3 Construction Requirements 3 <br /> 8 5-04.4 Measurement 25 <br /> I9 5-04.5 Payment 26 <br /> 10 Division 7 - Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits. 1 <br /> 11 7-04 STORM SEWERS 1 <br /> 12 7-04.2 Materials 1 <br /> 13 7-04.5 Payment 1 <br /> I <br /> 14 7-05 MANHOLES, INLETS, CATCH BASINS,AND DRYWELLS 1 <br /> 15 7-05.3 Construction Requirements 1 <br /> 16 7-05.4 Measurement 3 <br /> 17 7-05.5 Payment 3 <br /> I 18 7-06 STORMFILTER MEDIA CARTRIDGE FILTRATION SYSTEM 3 <br /> 19 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 12 <br /> 20 7-08.2 Materials 12 <br /> I 21 7-08.3 Construction Requirements 12 <br /> 22 7-08.4 Measurement 13 <br /> 23 7-08.5 Payment 13 <br /> 24 7-12 VALVES FOR WATER MAINS 13 <br /> I25 7-12.1 Description 13 <br /> 26 7-12.2 Materials 14 <br /> 27 7-12.4 Measurement 14 <br /> I <br /> 28 7-12.5 Payment <br /> 14 <br /> 29 7-20 PLASTIC DETENTION CHAMBER 14 <br /> 30 7-20.1 Description 14 <br /> I 31 7-20.2 Materials 14 <br /> 32 7-20.3 Construction Requirements 15 <br /> 33 7-20.4 Vacant 20 <br /> I34 7-20.5 Payment 20 <br /> 35 7-23 PRE-TREATMENT MANHOLE 20 <br /> 36 7-23.1 Description 20 <br /> 37 7-23.2 Materials 20 <br /> I <br /> 38 <br /> 39 7-23.3 Construction Requirement 21 <br /> 7-23.4 Measurement 22 <br /> 40 7-23.5 Payment 22 <br /> I41 Division 8 - Miscellaneous Construction 1 <br /> 42 8-01 EROSION CONTROL AND WATER POLLUTION CONTROL 1 <br /> I43 8-01.1 Description 1 <br /> 44 8-01.3 Construction Requirements 1 <br /> 45 8-01.4 Measurement 4 <br /> 46 8-01.5 Payment 4 <br /> I 47 8-02 ROADSIDE RESTORATION 4 <br /> 48 8-02.2 Materials 4 <br /> I City of Everett Page SP iii Special Provisions <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />