My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 8-02.3 Construction Requirements 4 <br /> 2 8-02.4 Measurement 7 <br /> 3 8-02.5 Payment 7 <br /> I <br /> 4 8-03 IRRIGATION SYSTEMS 8 <br /> 5 8-03.1 Description 8 <br /> 6 8-03.2 Materials 8 <br /> 7 8-03.3 Construction Requirements 11 <br /> 8 8-03.5 Payment 17 <br /> 9 8-04 CURBS, GUTTERS,AND SPILLWAYS 17 <br /> 10 8-04.3 Construction Requirements 17 <br /> I <br /> 11 8-04.5 Payment 18 <br /> 12 8-12 CHAIN LINK FENCE AND WIRE FENCE 18 <br /> 13 8-12.1 Description 18 <br /> I <br /> 14 8-12.3 Construction Requirements 18 <br /> 15 8-12.4 Measurement 19 <br /> 16 8-12.5 Payment 19 I 17 8-14 CEMENT CONCRETE SIDEWALKS 19 <br /> 18 8-14.1 Description 19 <br /> 19 8-14.3 Construction Requirements 19 <br /> 20 8-14.5 Payment 20 <br /> I <br /> 21 8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS,AND ELECTRICAL 20 <br /> 22 8-20.2 Materials 21 <br /> 23 8-20.3 Construction Requirements 21 <br /> 24 8-20.5 Payment 23 <br /> 25 8-21 PERMANENT SIGNING 23 <br /> 26 8-21.1 Description 23 <br /> 27 8-22 PAVEMENT MARKING 23 <br /> 28 8-22.1 Description 23 <br /> 29 8-22.2 Materials 23 <br /> 30 8-22.3 Construction Requirements 23 <br /> I <br /> 31 8-22.4 Measurement 24 <br /> 32 8-22.5 Payment 24 <br /> 33 8-27 RELOCATE EMERGENCY CALL STATION 24 <br /> I <br /> 34 8-27.1 Description 24 <br /> 35 8-27.2 Vacant 24 <br /> 36 8-27.3 Construction Requirements 24 I 37 8-27.4 Measurement 24 <br /> 38 8-27.5 Payment 24 <br /> 39 8-28 BIKE STORAGE UNITS (BIKELID) 25 <br /> 40 8-28.1 Description 25 <br /> I <br /> 41 8-28.2 Materials 25 <br /> 42 8-28.3 Construction Requirements 25 <br /> 43 8-28.4 Measurement 26 <br /> I <br /> 44 8-28.5 Payment 26 <br /> 45 Division 9 - Materials 1 <br /> 46 9-03 AGGREGATES 1 I <br /> 47 9-03.22 Non-Shrink Cement Sand Grout 1 <br /> 48 9-05 DRAINAGE STRUCTURES, CULVERTS,AND CONDUITS 1 <br /> 49 9-05.12 Polyvinyl Chloride (PVC) Pipe 1 <br /> 50 9-05.15 Metal Castings 2 <br /> City of Everett Page SP-iv Special Provisions <br /> I <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.