Laserfiche WebLink
I <br /> 1 Division 1 111 <br /> 2 General Requirements <br /> 3 I 4 <br /> 5 1-01 Definition and Terms <br /> 6 <br /> 7 1-01.3 Definitions <br /> 8 Section 1-01.3 is amended by adding the following: <br /> 9 <br /> I <br /> 10 All references in the Standard Specifications to the terms "State", "Department of <br /> 11 Transportation", "Washington State Transportation Commission", "Commission", "Secretary <br /> 12 of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall be revised to <br /> 13 read "Contracting Agency". <br /> 14 <br /> 15 All references to "State Materials Laboratory" shall be revised to read "Contracting Agency <br /> 16 designated location". <br /> I <br /> 17 <br /> 18 The venue of all causes of action arising from the advertisement, Award, execution, and <br /> 19 performance of the Contract shall be in the Superior Court of the County where the <br /> I <br /> 20 Contracting Agency's headquarters are located. <br /> 21 <br /> 22 Additive: A supplemental unit of Work or group of Bid items, identified separately in the <br /> I <br /> 23 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition to <br /> 24 the Base Bid. <br /> 25 Alternate: One of two or more units of Work or groups of Bid items, identified separately in I 26 the Proposal, from which the Contracting Agency may make a choice between different <br /> 27 methods or material of construction for performing the same Work. <br /> 28 Award Date: The date of the formal action by the Everett City Council to accept the lowest <br /> 29 responsible and responsive Bidder for the Work. <br /> 30 Bid Opening Date: The date on which the Everett City Clerk publicly opens and reads the <br /> 31 Bids. <br /> 32 Change Order: Reference to Change Order shall include all rights of the Owner and <br /> 33 Contractor under Section 1-04.4 Changes. Agreed Change Orders shall be in the form <br /> 34 included in Appendix E. Unilateral Change Orders shall be in the form for that purpose, <br /> 35 included in Appendix E. <br /> 36 Completion Date: Date on which Project is ready for Final Acceptance. All physical Work, <br /> 37 including Punch List, is complete and the Contractor has completed and fulfilled all <br /> 38 contractual obligations except any maintenance of landscaping. Contractual obligations <br /> 39 that must be fulfilled prior to achievement of the Completion Date include, but are not <br /> 40 limited to, the Contractor's furnishing all documentation (including correct, complete and <br /> 41 accurate as-built or record drawings) and operation and maintenance manuals and transfer <br /> 42 of warranties. <br /> 43 Contract Claim: Any request by the Contractor for additional time or money (adjustment of <br /> 44 Contract Sum or Contract Time) irrespective of the cause or reason for the request. <br /> 45 Contract Claims include, but are not limited to, requests by the Contractor for additional <br /> 46 time or money due to Extra Work, inefficiencies, delays, interferences, and problems with <br /> 47 the design. Contract Claim includes, but is not limited to, claims or requests by <br /> City of Everett Page SP1-2 Special Provisions I Everett Station 80 Stall Parking Expansion June 2019 <br />